「terminal」の共起表現一覧(1語右で並び替え)15ページ目

terminal

<前へ 1 2 .... 5 6 7 8 9 10 11 12 13 14 15

1語右で並び替え

該当件数:2907件

  • as typically done by having a menu on the DNC terminal where the operator had to manually indicate w
  • ran along the road to the West Shore Railroad Terminal, where ferries traversing the river to Manhat
  • Direct northbound service travels to Hoboken Terminal, where connection to PATH to midtown Manhatta
  • to the industrial complex is the new Bayport Terminal, which contains both a major new cargo contai
  • This is the Bacton Natural Gas Terminal, which receives gas through pipelines from th
  • tation lies next to and beneath Grand Central Terminal, which serves all Metro-North Railroad lines
  • ade is provided in departure hall of domestic terminal which has several stores selling traditional
  • it could not maintain the decaying Allapattah terminal, which also posed logistical problems for pas
  • lions of dollars were spent replacing the old terminal, which hosted a half-dozen airlines before it
  • On October 4, 2007, New York Container Terminal, which operates Howland Hook, announced the o
  • This was the reason for the expansion of that terminal, which started in 2005.
  • nd Girls Club and the abandoned Greyhound Bus terminal, which was then demolished.
  • These buses converge at the nearby Arrott Terminal, which the station shared part of its name wi
  • ground station at Dulles Airport close to the terminal, which was approved by the MWAA Board.
  • uld not be confused with the Newmarket GO Bus Terminal, which is at Davis Drive West and Eagle St. a
  • The station is nearby the BAT bus terminal, which is located across the street.
  • The airport has two runways and a single terminal which has eight gates.
  • The terminal which started operations in 2006 belongs to t
  • were filmed in the older 1962 Birmingham Air Terminal which is adjacent to the current terminal and
  • Hydrofoil terminal, which is very busy during summertime with da
  • ing for the new Lake Charles Regional Airport terminal, which was completed in 2009.
  • built during the construction of the airport terminal, which opened on September 21, 1980, but it w
  • The town has a small bus terminal which serves as a hub with bus links to the r
  • the army barracks were replaced with a small terminal, which was expanded in 1960.
  • ex includes a shopping center and a large bus terminal, which is the terminus for many local bus lin
  • first part to be built was the international terminal which had two aerobridges followed by the dom
  • Albion was the location of the Albion Ferry terminal which, until recent completion of the Golden
  • red because the user can read text behind the terminal while entering commands into the command line
  • other international airlines will use the new terminal, whilst domestic and charter carriers will us
  • ly fuscous at apex; hind wing: a very slender terminal white thread before the anticiliary black lin
  • crescentic white markings, followed by a few terminal white specks.
  • Flowers axillary or terminal, white or cream in clusters of 6-10, 1.5-2 cm
  • or nearly complete series of subterrninal and terminal white spots, the former larger than the latte
  • ad but faint and ill-defined sub-terminal and terminal white lines.
  • white; a series of jet-black spots, a slender terminal white line and a conspicuous jet-black antici
  • n the hind wing; finally, the subterminal and terminal white bands as on the upperside but better de
  • ng and much more conspicuous; subterminal and terminal whitish lines.
  • The Exit to Lei Tung Estate Bus Terminal will connect to the concourse by elevators in
  • The new terminal will have one satellite building, and when op
  • The LNG terminal will connect to three major natural gas pipel
  • After the second building phase finished the terminal will be capable of letting through up to ten
  • The design of the new passenger terminal will closely follow that of the old Union tra
  • This new terminal will have a clearance of 16m and gantries sui
  • Otherwise, if compositing is disabled, the terminal will only be translucent with the user's desk
  • The terminal will receive a LNG carrier every three days f
  • The terminal will have an initial capacity of 10 bcm per a
  • The terminal will provide an important source of natural g
  • That terminal will operate service to downtown San Francisc
  • You have two windows: Terminal window and Notepad.
  • d output specified on the system (usually the terminal window).
  • background will reveal the windows behind the terminal window.
  • suitable for simple fixed-width printers and terminal windows.
  • ies, has firm bones and the mouth is wide and terminal with bands of villiform (brushlike) teeth.
  • of the Oyster Point/South San Francisco Ferry Terminal with service to the Jack London Square/Oaklan
  • saction that Delta Air Lines would vacate the terminal, with US Airways commencing service with thei
  • d Line begins at the Wakefield - 241st Street terminal, with two tracks and one island platform (and
  • ed from Memphis Union Station to Dallas Union Terminal with a branch from Lewisville, Arkansas to Sh
  • This line runs north-south to Hoboken Terminal with connections via the Secaucus Junction tr
  • At Mongstad, Statoil has a crude oil terminal with a capacity of 9.5 million barrels.
  • is built mainly to connect the international terminal with domestic terminal and runs for a distanc
  • The station is 78.5 miles to Grand Central Terminal, with travel time there being an average two
  • Aside from being a passenger terminal with ferries to the United Kingdom, the harbo
  • nt commuter service to the waterfront Pavonia Terminal with connections to the Pavonia Ferry to Lowe
  • lem Stagecoach run the "Hoverbus" linking the terminal with Portsmouth and Southsea station and Port
  • Running Guake is faster than launching a new terminal with a keyboard shortcut because the program
  • ning Tilda can be faster than launching a new terminal with a keyboard shortcut because the program
  • The airport has a very small terminal with no gates.
  • 87-square-meter (66,600 sq ft) main passenger terminal with three levels.
  • Team Trafikk serves the terminal with several routes by city bus.
  • It also owns an oil terminal with a transit capacity of 7 million tonnes p
  • ion when the upper level was converted from a terminal with presumably a straight line to end of tra
  • Radar terminal with high performance
  • replaced the art deco styling of the original terminal with a "modern" steel-and-glass look of the s
  • Display terminal with high performance
  • tation architectural style, it is a two story terminal with one concourse.
  • is located next to the baggage claim at each terminal with escalator and elevator access from each
  • nt overlooks the huge Cheriton Channel Tunnel terminal, with views to France across the roofs of Fol
  • Construction of a car export terminal with a capacity of handling 400,000 cars annu
  • ter harbour was sold to the public as a ferry terminal with 150,000 trucks passing through yearly an
  • de passengers and other visitors to the North Terminal with a sense of open space and magnificent vi
  • This line runs to Hoboken Terminal with connections via the Secaucus Junction tr
  • Executive Airport terminal with available meeting rooms
  • The mouth is terminal with very small, conical teeth.
  • unning Yakuake is faster than launching a new terminal with a keyboard shortcut because the program
  • The City of Minot operates a general aviation terminal with flight service operations.
  • elevated annex at the back (east side) of the terminal, with passenger walking to the main terminal
  • ed in a minor collision at the Auckland Ferry Terminal with the moored Starflyte, due to steering fa
  • The layout of the terminal, with passenger boarding gates very close to
  • single-track line runs north-south to Hoboken Terminal with connections via the Secaucus Junction tr
  • ion is 71.1 miles (114.4 km) to Grand Central Terminal, with travel time there being an average of t
  • The mouth is terminal, with the jaws and lips equal.
  • Direct underground passageways connect the terminal with the 1 2 3 7 <7> A C E N Q R S New York C
  • l underground tunnels to connect the landside terminal with the airside terminal.
  • er to read emails and web pages in Tamil on a terminal with only a shell account.
  • This line runs to Hoboken Terminal with connections to New Jersey Transit one-st
  • Freight terminal with 333 North Michigan Wrigley Building and
  • There is no dedicated bus terminal within the station, so a paper transfer or an
  • rce Shetland Islands Council to accept an oil terminal without financial benefit to the islands.
  • than 30 million tonnes of crude oil from the terminal without a single incident.
  • Terminal World, London: Gollancz, 2010, ISBN 0-575-077
  • The new terminal would replace the Allegheny County Airport wh
  • One terminal would be dedicated exclusively to Southwest A
  • The proposed terminal would store up to 450,000 cubic meters of LNG
  • The Crown Landing LNG terminal would bring in a new supply of natural gas, a
  • a carfloat at this end with transfers to Bush Terminal Yard at the former Bush Terminal.
  • public transport, from the Bukit Mertajam bus terminal, you can take bus no.
<前へ 1 2 .... 5 6 7 8 9 10 11 12 13 14 15