「structural computation」を含む例文一覧(9)

  • STRUCTURAL COMPUTATION DEVICE FOR UNIT SCHEME BUILDING
    ユニット式建物の構造計算装置 - 特許庁
  • When the error falls within the range of tolerance, stress, displacement and the like computed by the structural analysis, computation is set as the final analytical results (S8, S9).
    誤差が許容値の範囲内になったときに,構造解析計算により算出した応力や変位などを最終的な解析結果とする(S8,S10)。 - 特許庁
  • The pressure to be applied is compensated once again (S9) from the error between right reactive force to a load A and total reactive force B, consisting of the reactive force at a supporting point obtained from a structural analysis computation, and the structural analysis is re-executed (S5).
    また,荷重に対する正しい反力Aと,構造解析計算により求めた支点反力の合計の反力Bとの誤差から負荷する圧力を再補正し(S9),構造解析を再実行する(S5)。 - 特許庁
  • To effectively reduce a storage area and computation time, even when there is dependency between node displacement, by performing a change of number by a flexibility unit in addition to a node unit in a structural analysis computation using a matrix method.
    マトリクス法を用いた構造解析計算において、節点単位だけではなく、自由度単位で番号の付け替えを行うことで、節点変位間に従属関係がある場合にも、記憶領域および計算時間を効果的に削減する。 - 特許庁
  • A picture drawing computation processing part 34 of a shader unit 30 issues a texture command for specifying three-dimensional texel coordinate values (u, v, w) for referring to a texture structural body 52 for a texture unit 70.
    シェーダユニット30の描画演算処理部34は、テクスチャ構造体52を参照するための3次元テクセル座標値(u,v,w)を指定したテクスチャ命令をテクスチャユニット70に対して発行する。 - 特許庁
  • Thereby, unlike the constructing three- dimensional model data, the necessary amount of data is reduced to a large extent, the data input work is alleviated, and the structural computation can be performed easily and promptly.
    これにより、三次元モデルのデータを構築するのに比べ、必要なデータ数が大幅に低減され、データの入力作業が軽減され、構造計算が容易かつ迅速に行えるようになる。 - 特許庁
  • A third structural portion is a portion that computes driving power and cycle of the motor/generator 30, obtains a torque estimation value and compensates for the current command value based on the torque estimation value, and compensating for a torque change and is equivalent to a power computation portion 58, a cycle computation portion 60, a torque estimation portion 62, and a current command compensation portion 70.
    第3の構成部分は、モータ・ジェネレータ30の駆動電力と回転数を演算し、トルク推定値を求めて、これに基づいて電流指令値を補償し、トルクの変化を補償する部分で、電力演算58、回転数演算60、トルク推定62、電流指令補償部70がこれに相当する。 - 特許庁
  • To set a boundary condition in the case where a differential coefficient in a direction perpendicular to a boundary is not 0 when performing iterative computation using an unramified and non-orthogonal structural grid, so that numerical calculation doesn't become unstable and a solution of high precision can be obtained.
    非分岐かつ非直交の構造格子を用いて反復計算を行う際に、境界に垂直な方向の微分係数が0でない場合の境界条件を、数値計算が不安定とならず、精度の高い解が得られる様に設定する。 - 特許庁
  • To improve computation precision by determining the coordinate system of a VOXEL model having the minimum volume error from a actual object to be analyzed when a structural analysis is taken by using a VOXEL method, in the coordinate determination processing method for the VOXEL model.
    VOXELモデルの座標決定処理方法に関し,VOXEL法を用いて構造解析を行う際に,実際の解析対象物との体積誤差が最小となるVOXELモデルの座標系を決定し,計算精度を向上させることを目的とする。 - 特許庁

例文データの著作権について

  • 特許庁
    Copyright © Japan Patent office. All Rights Reserved.