「First Time」を含む例文一覧(17982)

<前へ 1 2 .... 350 351 352 353 354 355 356 357 358 359 360 次へ>
  • At the time of continuously coating the front and back surfaces of the steel plate traveling in the vertical direction with a surface treating liquid before or after plating process, the coating is carried out to perform the adjustment of the average coating quantity at first, and after that, the coating quantity is uniformalized with a smoothing roll or by jetting a gaseous fluid from the vertical direction to the surface of the steel plate.
    めっき工程前またはめっき工程後の鉛直方向に走行する鋼板の表裏面上に表面処理液を連続的に供給しながら塗布する際、まずコーティングを行って平均塗布量の調節を施し、その後均しロールを用いてまたはガス流体を鋼板面に垂直方向から噴射して塗布量の均一化を施すことを特徴とする鋼板への表面処理液の連続塗布方法。 - 特許庁
  • When a sterilization shower switch is turned on, no matter what is a control state at the point of time, a controller forcibly drives an ion generator and repeats first air volume control for making a sirocco fan generate the air flow of a prescribed air volume and second air volume control for making the sirocco fan generate the air flow of an air volume less than the prescribed air volume for a prescribed number of times.
    制御装置は、除菌シャワースイッチがオンされた場合に、その時点での制御状態がいかなるものであっても、強制的に、イオン発生装置を駆動させるとともに、シロッコファンに所定の風量の空気の流れを生じさせる第1風量制御と、シロッコファンに所定の風量よりも少ない風量の空気の流れを生じさせる第2風量制御とを、所定回数繰り返す。 - 特許庁
  • This positional information measuring instrument measures the positional information on alignment marks AM formed on a wafer W by electrically processing detecting signals obtained by irradiating the marks AM with light and, for the alignment mark for which the positional information is first measured, measures the positional information by making AGC effective and stores the amplification factor and offset value obtained at the time of measuring the information.
    本発明の位置情報計測装置は、ウェハW上に形成されたアライメントマークに照明光を照射して得られる検出信号に対して電気的処理を施してアライメントマークAMの位置情報を計測するものであって、ウェハ上の最初に位置情報を行うアライメントマークに対してはAGCを有効にして計測を行って、計測時の増幅率及びオフセットの値を記憶する。 - 特許庁
  • A management device 3 determines that the generation timing is either in the first or second period when the bonus prize winning is generated at the slot machine 1, and records bonus data including at least the number of games between bonus games as bonus prize winning history data corresponding to the determination result every time bonus prize winning is generated, and the bonus prize winning history data is output from a monitor 3a.
    管理装置3は、スロットマシン1でボーナス入賞が発生したときに、その発生タイミングが前記第1期間及び第2期間の何れであるかを判定すると共に、ボーナス入賞が発生する毎に、少なくともボーナス間ゲーム数を含むボーナスデータを、前記判定結果と対応付けたボーナス入賞履歴データとして記録し、そのボーナス入賞履歴データをモニタ3aにより出力する。 - 特許庁
  • At the time of electrically connecting the terminals of a liquid crystal panel 400 and a circuit board 7 to each other in a portable telephone, the first flexible substrate terminal 608 of a flexible substrate 60 is electrically connected to the panel input-output terminal 481 of the panel 400 through an anisotropic conductive film after a connector 65 is mounted on the second flexible substrate terminal 609 of the flexible substrate 60.
    携帯電話機において、液晶パネル400と回路基板7との間で端子同士を電気的に接続するにあたって、フレキシブル基板60の第2のフレキシブル基板側端子609にコネクタ65を実装した後、フレキシブル基板60の第1のフレキシブル基板側端子608を液晶パネル400のパネル側入出力端子481に異方性導電膜によって電気的に接続する。 - 特許庁
  • An imaging method includes an imaging condition determination step of determining an imaging condition of each photosensor pixel 27 at specified intervals of time through first sensing operation by the photosensor pixel 27 with arbitrary external light luminance by using a previously stored coefficient, and an imaging information acquisition step of acquiring imaging information by performing second sensing operation by the each photosensor pixel 27, based upon the determined one imaging condition.
    任意の外光照度において、各ホトセンサ画素27による第1センシング動作に基づき、各ホトセンサ画素27による撮像条件を予め記憶した係数を利用して所定時間毎に決定する撮像条件決定ステップと、前記決定された一つの撮像条件に基づき、各ホトセンサ画素27により第2センシング動作を行い撮像情報を取得する撮像情報取得ステップとを備える。 - 特許庁
  • When detecting the positions and capacities of all the free spaces in the data areas based on the control data recorded on the disk 1, and recording the signals in the free spaces at a predetermined transfer rate, the system controller 3 checks whether the continuous recording and reproducing is possible or not for a series of recording signals based on the time needed to seek the data areas and the capacity of the first track buffer 10.
    システムコントローラ3が、ディスク1に記録されているコントロールデータに基づいて、データ領域間の全ての空き領域の位置と容量をそれぞれ検出し、その空き領域に所定の転送レートで記録信号の記録を行う場合に、データ領域のシークに要する時間、第1のトラックバッファ10の容量等に基づいて、一連の記録信号の連続的な記録再生が可能であるか否かを判別する。 - 特許庁
  • Adhesion by molecular bonding of two free surfaces of first and second substrates, for example formed by monocrystalline silicon wafers, comprises at least successively: a cleaning step of the two free surfaces with hydrofluoric acid in vapor phase to make the two free surfaces hydrophobic, a rinsing step of the free surfaces with deionized water with a time period less than or equal to 30 seconds, and a step of bringing the free surfaces into contact.
    例えば単結晶シリコン・ウエハによって形成される、第1および第2の基板の自由表面の分子接合による接着は、少なくとも連続して、自由表面を疎水性にするための、気相のフッ化水素酸での自由表面の洗浄ステップと、30秒以下の時間の、脱イオン水での前記自由表面のすすぎステップと、前記自由表面を接触させるステップと、を含む。 - 特許庁
  • To provide a means for simply manufacturing automobile pneumatic tire side wall sections which exhibit excellent reflectivity and a brilliant and silvered color tone over a long period of time in the automobile pneumatic tire non-black side wall section rubber mixture containing one or more rubber components as the polymer, at least one type of silicic acid as the first filler and, in addition, a processing aid and other additives to be conventionally used.
    ポリマーとして1種類以上のゴム成分、第一フィラーとして少なくとも1種類の珪酸並びに更に加工助剤および通例に使用される別の添加物を含有する自動車空気タイヤ用の非黒色側壁部用ゴム混合物において、優れた反射能力並びに長期間ブリリアントで銀色に輝く色調を示す自動車空気タイヤ用側壁部を簡単に製造するための手段の提供。 - 特許庁
  • In a switching power supply obtaining other DC output insulated from a DC power supply 1 by utilizing DC resonance of a capacitor 4 and the leakage inductor of a transformer 5, the resonance capacitor 4 is protected through simple circuitry by controlling the on interval of a first switching element to be shortened only for a predetermined time at the start by a control circuit 11 thereby preventing application of overvoltage to the resonance capacitor 4.
    コンデンサ4とトランス5のリーケージインダクタとの直列共振を利用して直流電源1から絶縁された他の直流出力を得るスイッチング電源装置において、起動時の一定時間のみ第1スイッチ素子のオン期間を短くなるように、制御回路11で制御することにより、簡単な回路構成にて共振用コンデンサ4に過電圧が掛からないようにして保護を図る。 - 特許庁
  • The P-type doped silicon precursor, in which a dopant is bonded to a polymer of cyclopentasilane, is formed by irradiating a cyclopentasilane solution 11 with ultraviolet rays 15 emitted from a high-pressure mercury lamp 14 and including a ray having a first wavelength for radicalizing a dopant and a light having a second wavelength for radicalizing the cyclopentasilane, and at the same time, supplying diborane gas as a dopant gas 16 to the cyclopentasilane solution 11.
    シクロペンタシラン溶液11に、ドーパントをラジカル化するための第1の波長の光と、シクロペンタシランをラジカル化するための第2の波長の光を含む紫外線15を高圧水銀ランプ14から照射し、同時にドーパントガス16としてのジボランガスをシクロペンタシラン溶液11に供給することにより、シクロペンタシランの重合体にドーパントが結合したP型ドープシリコン前駆体を生成する。 - 特許庁
  • When the alarm stop button of an intercom master unit 1 is pressed for the first time while the intercom master unit 1 connectable with an intercom slave unit 2 and fire alarms 3, 3, 3 output alarm sounds, the intercom master unit 1 stops the output of the alarm sounds associated thereto and transmits an associated alarm stop signal to the fire alarm 3 to stop the alarm sounds associated thereto.
    ドアホン子器2との間で通話を可能とするインターホン親機1と火災警報器3,3,3とが警報音を出力する中で、インターホン親機1の警報停止釦が押下されると(1回目の押下)、インターホン親機1は自己の連動警報としての警報音の出力を停止するとともに、火災警報器3に連動警報停止信号を送信して連動警報としての警報音の停止を要求する。 - 特許庁
  • To provide a method of manufacturing a semiconductor device by which the voids in a second trench can be suppressed when an embedded film is formed in the second trench after an alignment mark is formed for positioning on a semiconductor substrate by using the second trench, in the case where a photolithographic step is performed after a first trench is formed in an element at the time of manufacturing a semiconductor device having a trench structure in the element.
    素子内にトレンチ構造を有する半導体装置の製造方法において、素子内に第1のトレンチを形成した後に、フォトリソグラフィ工程を有する場合、マスク合わせのため、半導体基板にアライメントマークを第2のトレンチにより形成し、この第2のトレンチ内に埋め込み膜を形成したとき、この第2のトレンチ内にボイドが発生するのを抑制できる半導体装置の製造方法を提供する。 - 特許庁
  • A reset signal generation means 20 initially resets the hardware part by generating a first reset signal starting from the rising process of the voltage of a power supply part 10 and sending it to a reset means 30, and resets the hardware part again by generating a second reset signal in prescribed time after the rise of the voltage of the power supply part 10 and sending it to the reset means 30.
    リセット信号生成手段20が電源部10の電圧の立ちあがり過程から始まる第1のリセット信号を生成してリセット手段30に送ることによってハードウェア部を最初にリセットせしめ、次に電源部10の電圧が立ちあがった後の所定時間に第2のリセット信号を生成してリセット手段30に送ることによってハードウェア部を再度リセットせしめる構成とした。 - 特許庁
  • At this time, the controller 8 controls an irradiation timing of the first laser output part 4 and the second laser output part 65 so that the crystal growing from both ends of the irradiation region corresponding to a certain slit does not collide.
    このとき、あるスリットに対応する照射領域の両端部から成長する結晶が衝突しないように第1レーザ出力部4および第2レーザ出力部65の照射タイミングを制御した後、移動部7により被照射物を相対的に移動させ、他のスリットに対応する照射領域の両端部から成長する結晶が衝突するように第1レーザ出力部4および第2レーザ出力部65の照射タイミングを制御する。 - 特許庁
  • First, I am not saying that the impact of the subprime mortgage problem, which has been continuing for one year, on Japan’s financial system and real economy is small. I am saying that Japan has learned lessons from its past crisis and received limited damage this time compared with the United States and Europe, so we need to carefully watch future developments.
    まず、世界的な約1年にわたるサブプライムローンに端を発した金融、あるいは場合によっては実体経済まで影響が及びかねない状況というのは、日本は大きくないと言っているのではなくて、他に比べれば、日本の経験もございますので、欧米に比べればそうでもないという比較の問題であって、我々も注意して見ておかなければならないことだろうというふうに思っております。 - 金融庁
  • Sumitomo Mitsui Financial Group and Citigroup of the United States have reached a basic agreement on the sale of Nikko Cordial Securities, and they are expected to formally announce it soon. This will apparently be the first time that a securities company of such a large size comes under the wing of a bank. Could you tell us how you view this deal and the integration of the banking and securities industries?
    三井住友フィナンシャルグループとアメリカのシティが日興コーディアル証券の売却について基本合意しまして、近く正式に発表される見通しではあるんですけれども、あれだけ大きな規模の証券会社が銀行の傘下に入るということは初めてかと思うんですけれども、今回の枠組みと銀証の一体化が進む状況についてどのように見ていらっしゃるのかお願い出来ますでしょうか。 - 金融庁
  • As for the amendments, first, the "matters regarding the establishment of a responsible management system" in the original bill - which are matters to be included in a management enhancement plan to be submitted at the time of the application - was revised to read as the "matters regarding reform of the previous management system and the establishment of a responsible management system," in order to require the clarification of management responsibility as necessary.
    法案修正の中身としては、第一に、申請に必要となる経営強化計画の記載事項であります「責任ある経営体制の確立に関する事項」というのを「従前の経営体制の見直しその他の責任ある経営体制の確立に関する事項」というふうに条文を修正し、必要に応じ経営責任の明確化が求められることを法律上明確化するということ。 - 金融庁
  • To provide a WWW site history retrieving device capable of preventing the invalid URL of a WWW site while suppressing the collection scale of a WWW document, and returning the URL designating original WWW document contents or the contents similar to this in a real time even when the WWW document contents designated by the URL obtained by a browser at first are changed.
    WWW文書の収集規模を抑えながら、WWWサイトの無効URLを防止することができ、閲覧者が初めて辿ったURLが指定するWWW文書内容に変更があった場合にも、リアルタイムに元のWWW文書内容やこれに類似する内容を指定するURLを返信するWWWサイト履歴検索装置を提供する。 - 特許庁
  • where the applicant has received the first notice (hereinafter referred to in this Article as the "notice of reasons for refusal" under Article 50 [including the cases where it is applied mutatis mutandis pursuant to Article 159(2) (including the cases where it is applied mutatis mutandis pursuant to Article 174(1)) and Article 163(2), hereinafter the same shall apply in this paragraph] and said amendment is made within the designated time limit under Article
    第五十条(第百五十九条第二項(第百七十四条第一項において準用する場合を含む。)及び第百六十三条第二項において準用する場合を含む。以下この項において同じ。)の規定による通知(以下この条において「拒絶理由通知」という。)を最初に受けた場合において、第五十条の規定により指定された期間内にするとき。 - 特許庁
  • Here, neither the first power conversion means 3 nor a second power conversion means 4 starts operation while the inrush current flows, so that initial electrons can be produced in a bulb of an electrodeless discharge lamp 1 before high-frequency power is supplied from the second power conversion means 4 to an induction coil 2 to improve startability in the dark or after long-time neglect.
    このとき、突入電流が流れている期間においては第1の電力変換手段3及び第2の電力変換手段4の何れも動作を開始していないため、第2の電力変換手段4から誘導コイル2に高周波電力が供給される前に無電極放電灯1のバルブ内に初期電子を生成することができて暗所や長期間放置後の始動性を向上できる。 - 特許庁
  • To solve the problems wherein normal human foot skeletons normally have three arches, and wearing footwear with high heels, for example, for a long time compresses the transverse arch from the first metatarsal head to the fifth metatarsal head to cause calluses and resultant pains especially at the second metatarsal head and third metatarsal head on the sole, where pressure concentrates, and makes walking difficult.
    通常、ヒトの正常な足骨格には、3つのアーチがあるが、例えばヒールの高い履物を長時間着用すると、第一中足骨頭部から第五中足骨頭部にかけての横アーチが低下し、特に圧力が集中する足裏の第2中足骨頭部と第3中足骨頭部に胼胝(たこ)、及びそれに伴う疼痛が発生し、また歩行時には歩きにくくなるという問題が生じている。 - 特許庁
  • At the time of applying predetermined second pressure which is needed at inspection of an analyte 100, firstly, a piston 22 is displaced regardless of a detection pressure detected by a pressure sensor 30, thereby applying first pressure on the analyte 100, Then, the piston 22 is displaced in accordance with the detection pressure detected by the pressure sensor 30 so that the pressure applied to the analyte 100 is adjusted to the predetermined second pressure by a piston device 20.
    被検体100に検査時に必要な所定の第2圧力を印加する際には、まず、圧力センサ30が検出する検出圧力に係わらず、ピストン22を変位させて被検体100に第1圧力を印加し、次に、圧力センサ30が検出する検出圧力に応じてピストン22を変位させて、ピストン装置20で被検体100に印加する圧力を所定の第2圧力に調整する。 - 特許庁
  • The method of manufacturing the substrate sheet 10 with the conductive bump 62 includes: transferring conductive paste 60 onto the substrate sheet 10 for the first time; filling through holes 20a of a screen plate 20 with conductive paste 60 when transferring the conductive paste 60 to the substrate sheet 10 for second and succeeding times; and then transferring the conductive paste 60 to the substrate sheet 10 using the screen plate 20.
    導電性バンプ62付き基板シート10の製造方法において、基板シート10上に1回目の導電性ペースト60を転写した後、2回目以降の基板シート10への導電性ペースト60の転写において、スクリーン版20の貫通穴20aに導電性ペースト60を予め充填し、その後、このスクリーン版20を用いて基板シート10へ導電性ペースト60を転写する。 - 特許庁
  • The main control board 1 includes a single command output port and first driving circuits 53a, 55a for commonly outputting a control command to the sub-control boards, and an STB output port and second driving circuits 53b, 55b for outputting strobe signals STB different in each sub-control board, and the main control board 1 transmits the control commands time-sequentially to sub-control boards 2-5.
    主制御基板1には、サブ制御基板に対する制御コマンドを共通的に出力する単一のコマンド出力ポート及び第一駆動回路53a,55aと、サブ制御基板毎に異なるストローブ信号STBを出力するSTB出力ポート及び第2駆動回路53b,55bとが設けられ、主制御基板1は、サブ制御基板2〜5に対して、制御コマンドを時間順次に伝送する。 - 特許庁
  • An initial current value determiner 61c determines whether the current value flowing to the lamp, which is measured when the lamp is lit for the first time after a power supply of a vehicle is turned on, is within a normal range thereof, and the disconnection detector 61b uses the current value which is determined that it is within the normal range as the reference current value to detect the disconnection of the lamp.
    そして、初回電流値判定手段61cによって、車両の電源投入後におけるランプの初回点灯時に測定された前記ランプに流れる電流値が、その正常範囲に含まれているか否かを判定して、断線検出手段61bが、正常範囲に含まれていると判定された前記電流値を基準電流値として用いて、前記ランプの断線を検出する。 - 特許庁
  • A list comparison part 35 compares peaks between the samples on the first peak list and determines whether compares peaks are a peak of the same and one component on the basis of whether a displacement of the retention time and a displacement in the maximum wavelength are both included in prescribed allowable ranges to list up the peak intensity of each peak in a second peak list creation part 36 for each sample to crate a second peak list.
    リスト比較部35では、この第1ピークリストに対して試料間のピーク比較を行い、保持時間のずれ及び極大波長のずれが共に所定の許容範囲内に含まれているか否かによって、比較したピークが同一成分のピークであるか否かの判定を行い、第2ピークリスト作成部36において各ピークのピーク強度を試料毎にリスト化した第2ピークリストを作成する。 - 特許庁
  • The spectrum measuring device 11 has a first recognition unit 30 dividing or subtracting, by or from the other, one of two sets of spectrum data detected at two different positions by the spectrum sensor 14 to calculate one set of correlation spectrum data correlating to the two original sets of spectrum data, and identifies at the same time the object of measurement corresponding to the two different positions on the basis of the calculated set of correlation spectrum data.
    このスペクトル測定装置11は、第1の認識部30にてスペクトルセンサ14にて検出される異なる2つの位置のスペクトルデータの一方から他方を除算もしくは減算してそれぞれ元の2つのスペクトルデータに相関する1つの相関スペクトルデータを算出し、この算出した相関スペクトルデータに基づいて前記異なる2つの位置に対応する測定対象を同時に同定する。 - 特許庁
  • In the playback process of a step SA6, a musical data is reproduced, while an image data is displayed on a screen one by one, each time the cymbal single blow which is the first switching point is sounded, among rhythm sounds in the reproduced musical piece; and while snare continuous blow sound which is the second switching point continues, a plurality of contracted images obtained by contracting the image data are simultaneously displayed on the display screen.
    ステップSA6の再生処理では、曲データを再生する一方、その再生される曲中のリズム音の内、第1の切替点であるシンバル単打音が発音される毎に画像データを順番に1枚ずつ画面表示し、第2の切替点であるスネア連打音が継続する間は画像データを縮小して得た縮小画像を表示画面に複数枚同時表示するスライドショー再生を行う。 - 特許庁
  • The temperature comparator 52 obtains the outlet part temperature by the first temperature sensor 40 and the middle part temperature by the second temperature sensor 42 respectively by starting the ice making operation, calculates the maximum temperature difference between both the temperatures when the timer 54 counts the set time set in advance, compares the maximum temperature difference and the threshold value set in advance to detect the presence of the occurrence of abnormal conditions in the ice making section 10.
    温度比較手段52は、製氷運転の開始により第1温度センサ40による出口部温度および第2温度センサ42による中間部温度を夫々取得して、予め設定された設定時間をタイマ54がカウントしたときに両温度の最大温度差を算出すると共に、該最大温度差と予め設定された閾値とを比較して製氷部10の異常発生有無を検知する。 - 特許庁
  • The second switch 7 is turned on upon receiving power supply from the power supply 5 by turn-on of the first switch 6, acceleration data are stored in the storage 3 until a state where the absolute value of the acceleration data is not more than a prescribed value continues for prescribed time, the acceleration data stored in the storage device 3 are outputted to the outside by an output device 4, and then the second switch 7 is turned off.
    第1のスイッチ6のオンによって電源5から電力の供給を受けて第2のスイッチ7をオンとし、その後に加速度データの絶対値が所定値以下の状態を所定時間継続するまでの間の加速度データを記憶装置3に記憶し、その後に記憶装置3に記憶された加速度データを出力装置4によって外部に出力し、その後、第2のスイッチ7をオフする。 - 特許庁
  • A polling is executed by a DMA control part on the basis of a logical state of a flag, and a first pointer and a second pointer in a descriptor 1617 are read again by the DMA control part after finishing the polling, and the content of the descriptor is renewed before finishing the polling to allow the access of the data buffer 1609 different from the access of the last time just after the polling.
    フラグの論理状態に基づいて上記DMA制御部によりポーリングが行われ、ポーリングの終了後にそのディスクリプタ(1617)における第1ポインタ及び第2ポインタが上記DMA制御部により再リードされ、上記ポーリングが終了する前に当該ディスクリプタの内容を更新することにより、ポーリング直後において、前回アクセスしたものと異なるデータバッファ(1609)のアクセスが可能とされる。 - 特許庁
  • The signal separating apparatus utilizes an adaptive FIR filter which operates on the basis of the least square algorithm analyzed result, for a first mixed signal and a second mixed signal like a stereo acoustic signal wherein a music signal and a voice signal having different channel propagation characteristics are mixed, to extract an elimination target signal like a voice signal with a high extent of temporal correlation within a short convergence time.
    前記信号分離装置は、相異なるチャンネル伝播特性を有するミュージック信号とボイス信号とが混合されたステレオ音響信号のような第1混合信号及び第2混合信号に対して、最小二乗アルゴリズム解析結果によって動作する適応FIRフィルタを利用して時間的な相関度が大きいボイス信号のような除去目標信号を短い収束時間の間に抽出できる。 - 特許庁
  • At this time, the impact absorbing stroke can be secured against both collision loads from ahead and above by making the base part 28 slide backward first and then slide downward, so that absorption effect of the collision energy can be improved because the mounting holes of the bracket 25 includes at least one circular arc long hole 25d that curves backward and downward from the front end toward the rear end.
    このとき、ブラケット25の取付孔は前端から後端に向かって後方かつ下方に湾曲する少なくとも一つの円弧状長孔25dを含むので、ベース部28は先ず後方にスライドした後に下方にスライドすることで、前方からの衝突荷重および上方からの衝突荷重の両方に対して衝撃吸収ストロークを確保し、衝突エネルギーの吸収効果を高めることができる。 - 特許庁
  • The depositing method of an inert coating on a substance surface includes a first process to expose the surface to plasma discharge for an enough time to activate the surface in the presence of an inert gas, and a second process to bring the activated surface into contact with a gaseous org. silicon material without plasma and to carry out vapor deposition of the org. silicon material on the activated surface.
    物質表面に不活性コーティングを付着させる方法において、不活性ガスの存在下で表面を活性化するのに十分な時間前記表面をプラズマ放電に曝す第1工程、およびプラズマがない状態で、活性化された表面と、ガス状有機珪素物質とを接触させ、この活性化された表面に有機珪素物質を蒸着させる第2の工程を含む前記方法。 - 特許庁
  • Article 3 Regarding application of the provisions of Article 7, paragraph 1 to the Operational Plan established by the National Public Safety Commission, the Director of the Financial Services Agency or the Director of the National Police Agency for the first time after the Act comes into force as, the term "for each year" in the paragraph shall be deemed to be replaced with "for a planning period of not exceeding one year and specified by the National Public Safety Commission, the Director of the Financial Services Agency or the Director of the National Police Agency".
    第三条 この法律の施行後第七条第一項の規定により国家公安委員会、金融庁長官又は警察庁長官が最初に定める実施計画についての同項の規定の適用については、同項中「一年ごとに」とあるのは、「一年未満で、国家公安委員会、金融庁長官又は警察庁長官の定める期間を計画期間として」とする。 - 日本法令外国語訳データベースシステム
  • The message of Bolton EYRES-MONSEL, First Lord of the Admiralty, by BBC from England, and the message of William STANDLEY, Chief of Naval Operation, by NBC from America were broadcast respectively, and it happened that the program by NBC finished earlier than planned, so the NBC broadcast the Japanese songs "Oedo Nihon-bashi Bridge" and "Kappore," which were completely unsuitable to the funeral memory, to fill its allotted time.
    イギリスからはボルトン・イヤーズ=モンセル海軍省(イギリス)のメッセージが英国放送協会から、アメリカからはウィリアム・スタンドレイアメリカ海軍作戦部長のメッセージがNBCからそれぞれ放送されたが、アメリカからの放送では予定より早く終了したため、時間調整に日本の曲として『お江戸日本橋』『かっぽれ』という、おおよそ追悼に似つかわしくない音楽が放送されてしまうというハプニングが起こった。 - Wikipedia日英京都関連文書対訳コーパス
  • Facilitating financing for SMEs is, in the first place, a very important task for deposit-taking financial institutions and other institutions with the financial intermediary function. I believe that it is important to enhance measures to facilitate the financing for SMEs, particularly at a time when they find it difficult to pass additional costs caused by the surging crude oil and raw materials prices to their customers.
    もとより、中小企業等に対する金融の円滑化というのは、預金取扱金融機関をはじめとする金融仲介機関の非常に重要な役割であるわけでありまして、特に昨今、原油や原材料価格が高騰する中で価格転嫁が困難と見られる中小・零細企業の資金繰り対策を拡充していくことは、この局面における大変重要な役割であると思っております。 - 金融庁
  • The Business Accounting Council (the “BAC” or the “Council”) first introduced provisions regarding the assumption that an entity would continue its business for a reasonable period of time (hereinafter referred to as the “going concern assumption”) to the Auditing Standards when they were revised in 2002, so as to address the increased concern of stakeholders, given the series of bankruptcies and considering the surroundings inter-alia that the International Standards on Auditing (ISAs) direct an auditor to address the going concern assumption.
    企業が将来にわたって事業活動を継続するとの前提(以下「継続企業の前提」という。)に関する監査基準については、平成14年の監査基準の改訂に際して、企業破綻の事例が相次ぎ、利害関係者の要望が強くなったことなどを背景に国際監査基準(ISA)などでも義務づけられていたことなどから導入されたものである。 - 金融庁
  • Sumitomo Mitsui Financial Group has already entered negotiations about the acquisition of Nikko Cordial Securities and Nikko Citigroup based on its preferential negotiating right. This would be the first time for a megabank and a major securities company to be integrated with each other so tightly. What is your view on the integration of a bank and a securities company?
    日興コーディアル証券と日興シティグループ証券の売却について、三井住友フィナンシャルグループの方で、今、優先的な交渉が始まっているのですけれども、大手のメガバンクと大手の証券会社がこれほど一体になるということはこれまでなかったかと思うのですけれども、そういった銀証一体が進む状況についてどのように見ていらっしゃるのか、お願いできますでしょうか。 - 金融庁
  • The Kamakura bakufu (Japanese feudal government headed by a shogun) was the first government to enforce the bukeho in the form of statutory law, the Goseibai-shikimoku (code of conduct for samurai), which was inherited by the Kenmu Code enforced by Muromachi bakufu, the bunkokuho (the law individual sengoku-daimyo enforced in their own domain) enforced by daimyo (Japanese territorial lord) during the Sengoku Period, and the Buke Shohatto (code for the warrior households) as well as the hanpo (code for regional domains) enforced during the time of the Edo bakufu; the bukeho thus became the prototype of codes for the military government to control the nation and for the regional administrations to maintain the feudal system and the regional order within their domains.
    鎌倉幕府において初めての成文法形式の武家法である御成敗式目が定められ、以後室町幕府の建武式目、戦国大名の分国法、江戸幕府の武家諸法度及び諸藩の藩法に継承され、武家政権における日本全国の支配及び地方政権における領国内の封建体制と地域秩序の維持の基本となった。 - Wikipedia日英京都関連文書対訳コーパス
  • Other grounds that support the views that the mastermind of the plot was the Imperial Court are that, after the Battle of Yamazaki, Nobutaka ODA tenaciously searched for Sakihisa KONOE by issuing an order to track down and dispose of him, that Kanemi YOSHIDA was interrogated for information, and that the original contents of "Kanemikyo-ki" (diary of Kanemi), which is the first class historical material for that time, were missing for approximately one month around Honnoji Incident and the section for 1582 was rewritten.
    また、山崎の戦いの後、織田信孝が近衛前久に対し追討令を出して執拗に行方を捜したこと、吉田兼見が事情の聴取を受けていること、更に当時の一級史料である『兼見卿記』(兼見の日記)の原本内容が本能寺の変の前後1か月について欠けており、天正10年の項目は新たに書き直していた、という点も、朝廷黒幕説を支える根拠とされている。 - Wikipedia日英京都関連文書対訳コーパス
  • Two years later, Hideyori was elevated to the position of Udaijin, and yet, Ieyasu yielded the position of Shogun to his son, Hidetada TOKUGAWA, showing his determination to pass down the position by hereditary succession; in the same year, in place of Kanetaka KUJO, Nobutada KONOE (whose name had changed from Nobusuke and who had been reinstated to Sadaijin in 1601) was appointed to Kanpaku for the first time in twenty-one years since he had started the soron, having caused a series of troubles thereafter; here, the tradition of rotating the position of Kanpaku among the five sekke was restored.
    そして2年後、秀頼は右大臣に昇ったものの、この年に家康は将軍職も2年後に息子徳川秀忠に譲って将軍職の世襲の意思を表し、同じ年に九条兼孝に代わって一連の問題の発端となった近衛信尹(信輔改め、慶長6年(1601年)左大臣還任)が相論発生以来21年目にして関白に任命されて五摂家による持ち回りが復活した。 - Wikipedia日英京都関連文書対訳コーパス
  • (6) A beneficiary who has notified the trustee under the provisions of paragraph (1) may at any time demand that the trustee of the trust with certificate of beneficial interest issue a certificate of beneficial interest pertaining to the beneficial interest set forth in the first sentence of paragraph (2). In this case, if there any certificate of beneficial interest was returned under the provisions of the second sentence of said paragraph, the expenses for issuing a certificate of beneficial interest shall be borne by said beneficiary.
    6 第一項の規定による申出をした受益者は、いつでも、受益証券発行信託の受託者に対し、第二項前段の受益権に係る受益証券を発行することを請求することができる。この場合において、同項後段の規定により提出された受益証券があるときは、受益証券の発行に要する費用は、当該受益者の負担とする。 - 日本法令外国語訳データベースシステム
  • (2) When receiving a request pertaining to the provision of the preceding paragraph, a Financial Instruments Business Operator, etc. shall accept said request by the time when he/she solicits to conclude or concludes the first Contract for Financial Instruments Transaction which belongs to the Kind of Contract pertaining to said request (hereinafter referred to as a "Subject Contract" in this Article), except in cases where the provision of paragraph (10) is applied or there are other justifiable grounds.
    2 金融商品取引業者等は、第十項の規定の適用がある場合その他正当な理由がある場合を除き、前項の規定による申出を受けた後最初に当該申出に係る契約の種類に属する金融商品取引契約(以下この条において「対象契約」という。)の締結の勧誘又は締結のいずれかを行うまでに、当該申出を承諾しなければならない。 - 日本法令外国語訳データベースシステム
  • Article 199 (1) When conducting an examination of evidence, the public prosecutor shall first examine all evidence for which he/she has requested examination and which he/she finds necessary for the adjudication of the case. After this process has been completed, the accused or his/her defense counsel shall examine the evidence for which he/she has requested examination and which he/she finds to be necessary for the adjudication of the case. However, when it is found to be appropriate, necessary evidence may be examined at any time.
    第百九十九条 証拠調については、まず、検察官が取調を請求した証拠で事件の審判に必要と認めるすべてのものを取り調べ、これが終つた後、被告人又は弁護人が取調を請求した証拠で事件の審判に必要と認めるものを取り調べるものとする。但し、相当と認めるときは、随時必要とする証拠を取り調べることができる。 - 日本法令外国語訳データベースシステム
  • The imaging reproducing apparatus extracts and continuously reproduces only the video photographed in the snap movie photographing mode, and changes second sound prepared apart from first sound recorded in the photographing for reproduction, thus obtaining the effect of change of video with satisfactory tempos for each prescribed time, preventing the sound from being interrupted in the change of the video, and hence reducing the user's sense of incongruity.
    スナップムービー撮影モードで撮影された映像のみを抽出して連続して再生するとともに、撮影時に録音した第一の音声とは別に用意された第二の音声を差し替えて再生することにより、所定時間毎に映像がテンポ良く切り替わっていくという効果が得られるとともに、映像の切り替わり時に音声が途切れることがなくなるため、ユーザが感じる違和感を低減することができる。 - 特許庁
  • The plasma display apparatus of the present invention comprises the plasma display panel comprising a plurality of scan electrodes, a scan driver for driving the scan electrodes and a scan pulse controller for controlling the scan driver to set the width of the scan pulse applied to the scan electrodes in the address period of at least one of a plurality of sub-fields to be less than a first critical time.
    本発明に係るプラズマディスプレイ装置は、多数の走査電極を含むプラズマディスプレイパネルと、前記走査電極を駆動するための走査駆動部と、前記走査駆動部を制御して、複数のサブフィールドのうち少なくともいずれかのサブフィールドのアドレス期間中に前記走査電極に印加される走査パルスの幅を第1の臨界時間以下とする走査パルス制御部と、を含むことを特徴とする。 - 特許庁
  • A step to calculate a first battery charging condition based on a measurement of no-load voltage of a battery, a step to calculate a second battery charging condition based on an integration of battery current over time, and a step to form a weighed average from the calculated battery charging conditions to get an average battery status, are the solutions.
    上記課題は、方法において、バッテリの無負荷電圧の測定に基づいて第1のバッテリ充電状態をもとめるステップと、時間に関するバッテリ電流の積分に基づいて第2のバッテリ状態をもとめるステップと、平均化されたバッテリ充電状態を得るためにこれらのもとめられたバッテリ充電状態から重み付けされた平均値を形成するステップとを有することによって解決される。 - 特許庁
  • In a first embodiment, a CPU 57 disconnects a line connection of an NCU 56 with an L-mode gateway 16 via a telephone line 15, and, when an operating procedure check button is operated, executes an operating procedure check indication process of indicating operation macro checking data stored in macro files in a RAM 51 one screen after another for specified time slots on a display 21.
    本第1実施形態において、CPU57は、NCU56とLモードゲートウェイ16との公衆電話回線15を介した回線接続を切断させ、その後に、操作手順確認ボタンが操作されると、RAM51内のマクロ用ファイルに記憶保存された操作マクロ確認用データを1画面分ずつ所定時間だけ表示器21に順次表示させる操作手順確認表示処理を実行する。 - 特許庁
<前へ 1 2 .... 350 351 352 353 354 355 356 357 358 359 360 次へ>

例文データの著作権について