「CATENARY」の共起表現一覧(1語右で並び替え)
該当件数 : 31件
| Light rail would also require installation of | catenary above the tracks and the required substations |
| Single Point Mooring (SPM) systems such as | Catenary Anchor Leg Mooring (CALM) buoys |
| The railcars operated on electric | catenary, and were more efficient than their heavyweig |
| The city built the roads, while the | catenary and the tracks were built by the tram company |
| vard and Dzhavarhaval Nehru has built trolley | catenary and hence does not pass any trolley line. |
| electrified in different ways (L3 by overhead | catenary and L3b by a third rail), the current L2 plat |
| lodge: the stable has a rectangular base and | catenary arches; the longeing ring has a square base w |
| he Direttissima as the current drawn from the | catenary at 300 km/h (186 mph) would be too high. |
| Catenary between Matawan and Long Branch was construct | |
| Though the motivation for extending the | catenary in 1966 to the freight terminal was to allow |
| This section of | catenary is self-adjusting (constant tensioning) with |
| uter Rail service due to Green Line flooding; | catenary lines still go to the junction for offloading |
| Rail performs trackwork, designs and installs | catenary lines, installs and maintains signals, and fu |
| is extended into a flexible pipeline up to a | catenary on the production platform. |
| n a three-year project in 2009 to replace all | catenary on its line between Michigan City and Gary, s |
| ed in 1986, vandals began stealing the copper | catenary overhead wire. |
| end of third-rail power and start of overhead | catenary power. |
| dvantage of this closure to initiate rail and | catenary replacement on the line. |
| A Steel | catenary riser (SCR) is a common method of attaching a |
| construction project will include new track, | catenary, signals, communications equipment, and struc |
| The OHLE (overhead | catenary) system has been extended from Farringdon to |
| The system is powered by an overhead | catenary that supplies power at 750V (page 5) |
| s 241 and 233, because the maintenance of the | catenary was uneconomical. |
| ad in 1933, after the 11,000 volt AC overhead | catenary was completed between Trenton and Pennsylvani |
| Electric current is received via an overhead | catenary wire which supplies 750 volts into its DC mot |
| Electric current is received via an overhead | catenary wire which supplies 750 volts into its altern |
| arting the Dover station, the Morristown Line | catenary wires end about a half-mile west, near the US |
| Live | catenary wires are still in place above the trail betw |
| Power pickup was via pantograph from overhead | catenary wires, except on the Bay Bridge where a third |
| t breakers before being fed into the overhead | catenary wires. |
| m that allows air to remove the contact wire ( | catenary), with a cost overrun on the original project |
こんにちは ゲスト さん
|
ログイン |
Weblio会員(無料)になると
|
こんにちは ゲスト さん
|
ログイン |
Weblio会員(無料)になると
|