「Hydro」の共起表現一覧(1語右で並び替え)
該当件数 : 397件
Peace River in northern British Columbia by BC | Hydro, a major hydropower utility. |
The plant is operated by First | Hydro, a UK company owned by a joint venture of Inte |
the official report about Sayano-Shushenskaya | hydro accident was published by the Federal Environm |
Apart from the 2009 Sayano-Shushenskaya | hydro accident it has never happened that all the ge |
esponsibility for the 2009 Sayano-Shushenskaya | hydro accident, and was blamed by some for the 2010 |
In 1999 | Hydro acquired Norway's third largest petroleum comp |
In 1991 Norsk | Hydro acquired the 330 outlets of the Danish operati |
ho tried to purchase Saga, it ended with Norsk | Hydro acquiring the company. |
and Mines with responsibility for the Manitoba | Hydro Act and Seniors on May 9, 1988. |
being relieved of his duties for the Manitoba | Hydro Act. |
and Mines with responsibility for the Manitoba | Hydro Act. |
ral of Canada, the Select Committee on Ontario | Hydro Affairs, and the Ontario Royal Commission on E |
foundland governments sign the Churchill Falls | hydro agreement. |
On 28 November 2003, Lagos control cleared | Hydro Air 501, a Boeing 747-200 from Brussels Airpor |
The short Snowy | Hydro airstrip on the plateau above the town is ofte |
Hydro Aluminium (subsidiary of Norsk Hydro; Norway, | |
March 1986 - know - how contract signed with | Hydro Aluminium and start of construction ; |
remaining 55.3% is owned by Norwegian company | Hydro Aluminium part of Norsk Hydro based in Oslo, N |
coa, Alumina Limited, Rio Tinto Aluminium, and | Hydro Aluminium. |
Shipfitters are responsible for | hydro and air testing of tanks and compartments as w |
Settle | Hydro and Torrs Hydro are two reverse screw micro hy |
chased the Lower Mainland gas division from BC | Hydro and changed its name to BC Gas, serving 546,00 |
gineer and industrialist, the founder of Norsk | Hydro and Elkem. |
She then became a vice-president of Ontario | Hydro, and served as president and CEO when its name |
ka, with the remainder owned by Daimler, Norsk | Hydro and Shell Hydrogen. |
ring his period in office as reeve, Gloucester | Hydro and the Gloucester Police Force were establish |
Subsequently, with assistance from BC | Hydro and Ducks Unlimited, a system of dykes and oth |
om oil, and the remaining 3 percent comes from | Hydro and other renewables. |
12 the state bought the Tinnos Line from Norsk | Hydro, and started construction of a new railway fro |
the privatization of Newfoundland and Labrador | Hydro, and has championed other environmental causes |
The OTS is operated by Norsk | Hydro and includes other licensees. |
also chaired the electoral committees in Norsk | Hydro and Storebrand. |
minent defender of public ownership of Ontario | Hydro and sceptic on nuclear power. |
any (Statoil), one semi-private company (Norsk | Hydro) and one fully-private company (Saga). |
The dam is owned and operated by Manitoba | Hydro, and has a generating capacity of 130 megawatt |
In 1999, Saga Petroleum became a part of Norsk | Hydro and in 2007 a part of Statoil. |
le overhang Pelton turbines), along with other | hydro and thermal power stations belonging to TPCL, |
LEAPS is a joint effort of Nevada | Hydro and the Elsinore Valley Municipal Water Distri |
The company operates 55 thermal, | hydro and co-generation stations in Saint Petersburg |
It is owned and operated by Pacific | Hydro, and the electricity produced is sold to elect |
fuel stations in Norway and Denmark from Norsk | Hydro and Chevron. |
ission and co-chairman at the British Columbia | Hydro and Power Authority from 1962 to 1969. |
those of the National Museum of Norway, Norsk | Hydro and Statoil. |
ndidate Peter Kaufmann's plan to sell Winnipeg | Hydro, and tried to present Kaufmann with a sarcasti |
els and for alternative energy including wind, | hydro and solar to generate electricity |
cember 1977 agreement with Canada and Manitoba | Hydro as a modern-day treaty. |
Ontario | Hydro, as agreed, had operated the plant but-highlig |
He also worked for Norsk | Hydro, as a consultant to Kristian Birkeland, from 1 |
The Arrow Lakes reservoir is described by BC | Hydro as a "great waterway for boating". |
presentatives of Canada, Manitoba and Manitoba | Hydro as a treaty. |
y IG Farben, owning 25% of the shares in Norsk | Hydro, asked for permission to import five liters of |
In 1953 he was hired in Norsk | Hydro, becoming Director-General (CEO) in 1956. |
We have skyrocketing | hydro bills, higher taxes, job losses and Ontario is |
to assist low-income Ontarians with increased | hydro bills. |
ologies such as solar power, wind power, micro | hydro, biomass and biofuels might someday be used to |
ee decades following the Second World War, the | Hydro Board's teams of planners, engineers, architec |
hener area organizations: the Kitchener-Wilmot | Hydro Board, the University of Waterloo, Centre in t |
In 1903, the Vancouver Power Company (now BC | Hydro) built a 3.6 km (2 mi) long, 1.2 km (1 mi) dee |
The original name of the dam was Junction | Hydro, but it was renamed to honor a Consumers board |
She was in reality an alternative to extending | Hydro by at least twenty meters. |
Formerly Bridge Hall, then a | hydro called Bridge House (established by 1861). |
The water is of | hydro carbonate sodium-magnesium-calcium type, makin |
denets HPP, Kardzhali HPP forms the Dolna Arda | Hydro Cascade with total capacity of 276 MW. |
Subsequently, former alderman/ London | Hydro chairperson George Avola was convicted on thre |
He later ran for a seat on the North York | Hydro Commission in 1980, but was unsuccessful. |
Plant served as a member of the Ottawa | Hydro Commission. |
o elect mayors, alderman, school trustees, the | hydro commissioner and the reeve of McKim Township. |
929 when he resigned to be appointed a Toronto | Hydro commissioner. |
unicipal governance as one of the city's first | hydro commissioners and also served as an appointee |
mayors, municipal councils, school boards, and | hydro commissions in cities, towns and other incorpo |
On August 6, 2007 The Nevada | Hydro Company announced its agreement with Morgan St |
il it was leased to the Gilsland Spa Hotel and | Hydro Company of South Shields in 1893. |
the affected Northern communities and Manitoba | Hydro continue, to discuss mitigation measures and c |
municipal electric utilities in 1998, Toronto | Hydro Corporation is transformed into a holding comp |
ing Station built by Newfoundland and Labrador | Hydro Corporation is located near the community of H |
s a component of the Newfoundland and Labrador | Hydro Corporation's Bay d'Espoir Hydro Electric Deve |
His government also expanded Ontario | Hydro, created the Province of Ontario Savings Offic |
t is the closest settlement to Lake Burbury, a | hydro created lake from the damming of the King Rive |
The idea was to move electricity from the | Hydro dam on the Kootenay River at Brilliant to the |
, Fluid catalytic cracker, Catalytic reformer, | Hydro desulpherisation units, Gas recovery unit Isom |
The Upper Salmon | Hydro Development utilizes a portion of the residual |
tral Trust Company Limited and the Petitcodiac | Hydro Development Company and also helped establish |
vie & Bearsden youth team reached the Scottish | Hydro Development Cup Final, raising hopes that they |
It is the primary dam of the Tehri | Hydro Development Corporation Ltd. and the Tehri hyd |
e depleted, the government still permits small | hydro developments by the private sector up to a tot |
as designed and constructed by St. Louis-based | Hydro Dramatics. |
ty Ltd was formed by the disaggregation of the | Hydro Electric Commission in Tasmania, Australia, on |
d a site very close to this dam for a proposed | hydro electric scheme. |
By 1991 the | Hydro Electric Commission (now Hydro Tasmania) sold |
This cascading | hydro electric scheme consists of 5 power houses . |
ional park status of Lake Pedder, allowing the | Hydro Electric Commission to construct a dam floodin |
of the original Giant's Causeway and Bushmills | Hydro Electric Tram track. |
In 2001, Emera purchased Bangor | Hydro Electric Company. |
by the minister responsible for the Tasmanian | Hydro Electric Commission was visiting Stuttgart in |
It was one of the last | hydro electric power stations built by the HEC befor |
Two Major | Hydro Electric Projects namely Sabarigiri and Kakkad |
the famous tourist spot Peruvannamuzhi and the | hydro electric power generator station at Kakkayam i |
The Patea | Hydro Electric Scheme first produced power in May 19 |
falls on the Bow River, and the potential for | hydro electric power generation. |
as opened at Niagara Falls, Ontario to harness | hydro electric power for Toronto. |
e Rock Power Station is a 2.6MW rated capacity | hydro electric facility located at the Blue Rock Dam |
Though the village | hydro electric power station produces electricity, t |
the available water resources, along with the | Hydro electric power plant with the same name. |
3 Scottish sides, top clubs from the Scottish | Hydro Electric Premiership. |
er Water is also the site of England's largest | hydro electric plant. |
River and the creation of Lake Burbury by the | Hydro Electric Commission in the 1980s. |
kes in the Kananaskis and Bow Valleys used for | hydro electric power, flood control, and water reser |
s named after the Sultan as the "Sultan Mahmud | Hydro Electric Power Station". |
as accommodation for workers on the Tasmanian | Hydro Electric Commission's 'Tungatinah Scheme', 'Ni |
ible, the passenger experience of the original | hydro electric tram providing a nostalgic journey li |
ea around Turka, where there was an attempt at | hydro electric generation and flood control. |
The Tekeze | Hydro Electric project aims to construct the Highest |
Bangor | Hydro Electric Company |
In 1905 Rjukanfossen was built out to produce | hydro electrical power for the saltpetre production |
t for multipurpose project such as irrigation, | Hydro electricity production. |
Electricity - 700kWh generated through | hydro electricity contributing 50% of the countries |
ld Fields became the first town in Asia to get | hydro electricity. |
area's burgeoning industries with much needed | hydro electricity; however, the power scheme was nev |
Close by, in village Pathri, lies the Pathri | Hydro Electrict Power Station on the Upper Ganga Can |
Football Club, who currently play in Scottish | Hydro Eletric Premiership Division One and the Borde |
Within a few years the number of Norsk | Hydro employees in Rjukan had been reduced from 1,76 |
Plaque honouring Ontario | hydro employees who died in World War I and World Wa |
still apparently recorded till 30 June 2006 by | Hydro employees, but not appearing on the BOM websit |
It was a masterpiece of | hydro engineering constructed at a cost of $47.5 mil |
The plant is a | hydro engineering project and is used to control wat |
ed to England to have microfilmed plans of the | Hydro examined, and then return to Norway to plan a |
In the mid-to late 1990s, an old | Hydro exploration road accessing the Affliction Glac |
s sabotage actions including the sinking of SF | Hydro, featuring some of the original saboteurs. |
furic acids, phosphoric acids, phospho gypsum, | hydro fluo silicic acids, and granulated slag. |
The names of binary acids begin with | hydro- followed by the name of the other element modi |
ock Urban District Council bought Bridge House | hydro for use as the Town Hall and added a large win |
ber brought an action in court against Ontario | Hydro for the torts of trespass, nuisance, deceit, a |
He worked as a lawyer in Norsk | Hydro from 1984 to 1988, and then returned to the Un |
uated as siv.ing. in 1964, and worked in Norsk | Hydro from 1966 to 1968, in Dyno Industrier from 196 |
After that he worked at Norsk | Hydro from 1971 to 2001, the ten last as Chief Execu |
Deerfield River | Hydro Generating System (83 MW, USA) |
arch establishment at Chalk River and the HEPC | hydro generating station at Des Joachims, Ontario. |
ANDRITZ | HYDRO GmbH |
would travel to the north-east coast to gather | hydro graphic data. |
ntil he resigned from his position after Norsk | Hydro had been accused of corruption. |
Manitoba | Hydro has about 238,000 residential, and 24,700 comm |
The | Hydro has proposed refurbishment of the scheme with |
Between 2005 and 2010 BC | Hydro has considered more excavation at the narrows |
Having risen to Head of Drilling in Norsk | Hydro, he left in 2007 to become Chief Operating Off |
After he retired of CEO of Norsk | Hydro he took over as chairman of the board of Norsk |
biggest shareholder in both Statoil and Norsk | Hydro, holds 62.5% of the company. |
, The helical turbine: A new idea for low-head | hydro, Hydro Review, Vol. 14 (5) (1995). |
They are now partnered clearing trees for | hydro in Ontario. |
It merged with Norsk | Hydro in 2007 and was known as StatoilHydro until 20 |
The company was merged with Norsk | Hydro in 1986 to create the light metal division Hyd |
He started working for Norsk | Hydro in 1969, and had several positions in the alum |
rs who died during the development of Manitoba | Hydro in Fox Lake Cree Nation's territory and did no |
s was named chair of Newfoundland and Labrador | Hydro in 2003, serving until 2006, and was named to |
e Hydroelectric Power Station (or Barron Gorge | Hydro) in Queensland, Australia is a electricity pow |
il merged with the oil & gas division of Norsk | Hydro in 2007 to create StatoilHydro. |
After the sinking of | Hydro in 1944, Ammonia had to do the main hauling ac |
g Aristocrat was wrecked opposite the Imperial | Hydro in 1840. |
gsberg Engineering before being hired by Norsk | Hydro in 1984. |
He was hired in Norsk | Hydro in 1948 as head of their Notodden department. |
the Light", they urge their customers to "Save | Hydro in Your Home: Help Win the War!" |
y John Smedley in 1853 when it was the largest | hydro in the town. |
He was hired in Norsk | Hydro in 1943, advanced to become CFO in 1960 and as |
established in 1972 that was acquired by Norsk | Hydro in 1999. |
traffic, including to Rafnes in Bamble, Norsk | Hydro in Porsgrunn and Norske Skog Union in Skien. |
Reiten started working for Norsk | Hydro in 1988, heading the energy division from that |
The company was acquired by Ontario | Hydro in 1922, after private utilities ended in the |
fter that he had seveal executive positions in | Hydro, including CFO 1991-2002. |
In 2004, Norsk | Hydro installed a combined wind-Hydrogen utility on |
Smedley's | Hydro is a former hydrotherapy complex in Matlock, D |
In addition Snowy | Hydro is seeking to expand its gas-fired power stati |
Hydro is currently considering the redevelopment in | |
Another prototype drill called a | Hydro Jet Drill is able to work in hot damp conditio |
ole in dry years (such as 2001 and 2003), when | hydro lake inflows were insufficient to meet demand. |
and advertisements included: Abbott's cordial, | Hydro, Launceston Bank for Savings, Peters Ice Cream |
The pond is | hydro logically associatied with a cranberry bog loc |
The pond is | hydro logically associated with a cranberry bog oper |
spital from August 1942, with a section at the | Hydro Majestic Hotel at Medlow Bath. |
There is a polling station at the | Hydro Matric Survey Building in Manjampatti for all |
After Norsk | Hydro merged its operations in Denmark and Norway wi |
In 1995 | Hydro merged its stations in Norway and Denmark with |
Includes wind, wave, | hydro, microgeneration, smart grids, and grid integr |
A land surveyor employed with Hamilton | Hydro, Mitchell was active with the union movement i |
They serve customers with | hydro, natural gas, coal and biomass generation deli |
The | Hydro no.120 was a two-seat, single-engine biplane c |
ts Bristol construction number, 120, or as the | Hydro no.120. |
member of the boards of Aker Solutions, Norsk | Hydro, Ocean Heavy Lift and Awilco Offshore. |
system uses a crossflow turbine made by Valley | Hydro of Cornwall, and has a maximum flow rate of 49 |
By 2001, | Hydro One had acquired 88 municipal utilities. |
Hydro One has a 500 kV transmission line along with | |
ial government announced the intention to sell | Hydro One under an initial public offering, however |
ght) volt transmission lines in the GTA, which | Hydro One is responsible for. |
er 345 kV transmission line interconnects with | Hydro One. |
ry; in 1939 she was in service 340 days, while | Hydro operated 32 days and Rjukanfos 18. |
Hydro Ottawa was established during Ellis's period i | |
he Ottawa Electric Company, the predecessor to | Hydro Ottawa, and president of the Ottawa Power Comp |
Ontario | Hydro paid him sick benefits but after a time they b |
Hydro Phonic is the sixth release by the trip-hop/ra | |
The Columbia | Hydro plant was built at the southern end of the can |
こんにちは ゲスト さん
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |
こんにちは ゲスト さん
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |