小窓モード

プレミアム

ログイン
設定

設定

Weblio 辞書 > 英和辞典・和英辞典 > bore-holeの意味・解説 > bore-holeに関連した共起表現

「bore-hole」の共起表現一覧(1語右で並び替え)

該当件数 : 55



Schematic representation of the SAFOD borehole and pilot hole.
ure, and specializations of these, as well as Borehole and other observational artefacts.
on on land/shallow water, deep water, seabed, borehole and near-surface, to processing and interpret
he high-pressure zone will begin to enter the borehole and increase the amount of fluid coming out o
The government had capped the borehole as part of its effort to remove the indigenou
s) drilled a 1938m deep stratigraphic proving borehole at Mochras Farm between late 1967 and late 19
creation of a detailed record (well log) of a borehole by examining the bits of rock or sediment bro
mud, which is continuously pumped out of the borehole by a valve, taking advantage of the same reci
Borehole Caliper
The exploratory geothermal borehole drilled in December 2004 was the first to be
A hole opener is a device used to enlarge the borehole during a well drilling operation.
nce it allows the drill string to stay in the borehole during steering and coring.
io of count rates, which theoretically reduce borehole effects.
modern well log interpretation as it relates borehole electrical conductivity measurements to hydro
, laboratory experiments and the Jungfraufirn Borehole Experiment.
sian scientists filled it with to prevent the borehole from collapsing and freezing over.
Cross borehole GPR has developed within the field of hydroge
stern end of the Ventura Anticline, where the borehole had to reach a considerable depth before find
If the borehole has petrophysical measurements made of the wa
n addition, CIP systems can be built into the borehole headworks to permit the injection of cleaning
Borehole Images
e is to mechanically stabilize the BHA in the borehole in order to avoid unintentional sidetracking,
The borehole in this image is deviated from the vertical b
On March 14 1981, 'Pozo 6' the last scheduled borehole in the program, hit 52 metres of 1.51% copper
This process cleans the borehole interior and equipment without any invasive m
The borehole is lined for 60 metres, and the bottom 20 met
he true vertical depth, while line (b) is the borehole itself, and its length is called the measured
he True vertical depth, while line (b) is the borehole itself, and its length is called the measured
he True vertical depth, while line (b) is the borehole itself, and its length is called the measured
mmonly shortened to MD), is the length of the borehole, line (b) in the image, and is measured in fe
Also known as borehole logging.
It was first recovered from the borehole of bottled mineral water in Eastern Portugal.
s, H. fonticola, was first recovered from the borehole of bottled mineral water in Eastern Portugal.
ray (SAA) is a sensor that can be placed in a borehole or embedded within a structure to monitor def
he initial stable structural foundation for a borehole or oil well.
Borehole Research Group
After checking the borehole results of the Jubilee Line construction team
Borehole salinity
The Borehole Seam was mined until 1906 and the Wave Hill S
ft was 460 feet (140 m) deep and serviced the Borehole seam which here was about five feet nine inch
between December 2006 and March 2007, the six borehole seismometers installed near the Basel injecti
Known challenges with caliper logging include borehole spiralling.
Drilling of the Rookhope borehole subsequently confirmed the existence of this
Devico AS has developed their own set of borehole survey instruments to be used together with t
orial where he pointed out that the worldwide borehole temperature record indicated present day temp
wn in the oil industry, is an oil well with a borehole that deviates from a vertically straight line
As the cuttings are circulated out of the borehole they are sampled, examined (typically under a
ers from the formation into the bottom of the borehole through perforations that have been made thro
he space (annulus) between the casing and the borehole to a depth sufficient to retain the casing in
ter is built into the headworks to permit the borehole to inhale and exhale when the water level ris
ound that the Eastgate Geothermal Exploration Borehole was capable of providing water at 26°C, poten
about the lithology and fluid content of the borehole while drilling.
ed that the water temperature of a production borehole with a depth of about 1800m would be in the r
                                                                                                   


こんにちは ゲスト さん

ログイン

Weblio会員(無料)になると

会員登録のメリット検索履歴を保存できる!

会員登録のメリット語彙力診断の実施回数増加!

無料会員に登録する
英→日 日→英
こんにちは ゲスト さん

ログイン

Weblio会員(無料)になると

会員登録のメリット検索履歴を保存できる!

会員登録のメリット語彙力診断の実施回数増加!

無料会員に登録する

©2024 GRAS Group, Inc.RSS