「dam '」の共起表現一覧(1語右で並び替え)20ページ目
該当件数 : 3847件
a small business owner and served on the Beaver | Dam, Wisconsin Common Council 2000-2003. |
the great grandson of John S. Rowell of Beaver | Dam, Wisconsin (1825-1907), noted pioneer inventor |
volves construction of a 57-metre-high concrete | dam with five spillway blocks of 13 m each having o |
Maruyama | Dam with Sosui Gorge behind it |
The earth | dam with retaining wall is still in use. |
iend, Josephus Conn Guild, offered to build the | dam with private funding in exchange for the rights |
ling basin (Ausgleichsbecken) below the primary | dam, with a 10 m high dam wall, which controls any |
Agasthiyar Falls fed by lower | dam, with its year round bathable water temperature |
The stability and integrity of such a large | dam with a large reservoir helped bring confidence |
Looking east, Little Goose | Dam with lock & fish ladder on the right (south sid |
ties are available at four locations around the | dam, with access prohibited outside of daylight hou |
The powerhouse is situated at the toe of the | dam, with installed capacity of 6 units of 50 M.W. |
In 1947, TVA outfitted the | dam with a new gate-controlled spillway and raised |
vernment of Canada aided in the building of the | dam with long term loans and grants. |
Pyramid | Dam with Pyramid Lake is a part of the California A |
turbines alternate service duty to provide the | dam with its energy requirements. |
Built in 1985, the | dam, with the lovely lake surrounded by green fores |
ectric power plant, established in 1991, at the | dam, with a power output of 281 MW. |
The earth | dam with stone cladding on the water face is still |
lway is located on the southern abutment of the | dam with the hillside. |
The main barrier is an earth-fill | dam with a central concrete core and clay sealing. |
The current | dam with a height of 180 m was completed in 1974 an |
The | dam with total waterfront length of 13 km forms Gor |
The scheme draws water from a mass concrete | dam with radial drum crest gates constructed across |
View of Chulliar | Dam with the western ghats as background . |
It is an earthfill | dam with no power generation facilities. |
It is an earthfill | dam with a concrete spillway. |
quake on May 12, 2008 caused some damage to the | dam, with the dam having a few cracks and fissures. |
Mauvoisin | Dam, with Mont Blanc de Cheilon in the background |
Phase 1 was completed in 2006, the Tehri | Dam withholds a reservoir for irrigation, municipal |
There are no other | dam within 55 sq km. |
Along the way, build a | dam, work a canal, and use pulleys to ring a bell. |
Most of the original | dam works still exist today. |
Deconstructing the | dam would cost from 3 to 9.8 billion dollars, accor |
Such a | dam would have been built near the present outlet a |
recent years, it was discovered that Bluestone | Dam would be unable to pass the Probable Maximum Fl |
servoir, TVA engineers determined that a saddle | dam would be necessary to prevent water from the Mi |
The Stung Treng | Dam would be an earth core rockfill gravity dam. |
The | dam would have generated about 13,000 MW of power, |
The | dam would be built at 695 meters above sea level an |
It soon became apparent that the | dam would not be finished on time. |
Army Corps of Engineers, the Hells Canyon High | Dam would have been a straight-profile concrete gra |
Rumors spread that the | dam would place the two ruins underwater, spurring |
The | dam would be located 3 km upstream from Seddonville |
however, fears that the Chew Valley Lake | dam would be breached caused considerable anxiety. |
Once completed, the 40-foot (12 m)-high | dam would later impound 7.2 billion U.S. gallons (6 |
According to International Rivers, the | dam would have a seriously impact to fish migration |
こんにちは ゲスト さん
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |
こんにちは ゲスト さん
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |