「feasibility」の共起表現一覧(1語右で並び替え)2ページ目
該当件数 : 305件
Wethersfield also completed a | feasibility study with two nearby towns, Annawan and Ga |
5 May: Detailed | Feasibility Study approved and DPR would be prepared. |
A | feasibility study commissioned by Christchurch City Cou |
ent between the parties stipulated a 3 year | feasibility study (seismic study and drilling of 3 well |
ssioned CMPS&F Environmental to undertake a | feasibility study for cleaning up the town site. |
The | feasibility study was conducted by HYCRUDE Corporation, |
BHP, in late 2010, had agreed to a joint | feasibility study into how an arrangement might work. |
Cambridge Bay was chosen after a | feasibility study that also included Pond Inlet and Res |
n 1993, he was a consultant to a University | Feasibility Study at the Port Authority of Freeport, Ba |
A | feasibility study was done, which included the second p |
In March 2000, a | feasibility study report on a pumped-storage capability |
is that [we want them] to make available a | feasibility study in terms of the impact on the environ |
A | feasibility study has concluded that there is a strong |
Having served its | feasibility study purpose, Ken Miles' prototype was kep |
any was awarded the contract to perform the | feasibility study and the Environmental Impact Assessme |
Prior to construction, a | feasibility study determined that the vault could prese |
he underlying purpose of Camp Century was a | feasibility study of mobile nuclear missile launch site |
he Alliance for Performing Arts conducted a | feasibility study from whence major plans for restorati |
raisal was carried out in 1986, followed by | feasibility study in 1987, which decided to proceed wit |
lup and the City of Wanneroo commissioned a | feasibility study for an environment centre at the park |
This team of community leaders conducted a | feasibility study to gauge the level of need of student |
o reopen the line as a modern railway and a | feasibility study has been commissioned by CKP Railways |
The Gulf Coast Limited grew out of a | feasibility study conducted by the Louisiana-Mississipp |
A | feasibility study has been completed and a co-operative |
The Government is carrying out the | feasibility study to look at all the costs, benefits an |
In September 2009 a | feasibility study on a proposed mine was begun, which i |
ans to rebuild a station, going as far as a | feasibility study in 1997, but so far none have come to |
A | feasibility study and a detailed engineering report hav |
The Jovian Europa Orbiter (JEO) was a | feasibility study by the European Space Agency for a mi |
This led to the publication of the | feasibility study in February 2000 by the Scottish Exec |
In the summer of 2009 a | feasibility study was commissioned to investigate the p |
In 1998, a mine | feasibility study was completed and concluded based on |
he Tasmanian Government launched a six week | feasibility study to determine the possibility of a Tas |
A | feasibility study was completed by 2008 and the locatio |
After a successful | feasibility study in 2004, the BPC will be installing a |
Group conducted a public-private financing | feasibility study during 2005 and 2006. |
n, North Carolina received $5 million for a | feasibility study for this extension. |
The Government then completed a | feasibility study in 1989, followed by endorsement of t |
A | feasibility study into the line's re-opening was commis |
eement, South Stream Serbia AG will conduct | feasibility study of the Serbian section of the South S |
d the Wethersfield School Board conducted a | feasibility study on the subject of consolidation, whic |
A | feasibility study to take advantage of waste heat from |
Pune Municipal Corporation has started a | feasibility study of this skywalk on the Shivajinagar S |
am based at the Johnson Space Center made a | feasibility study for NASA's return to the Moon. |
A major economic | feasibility study is now being conducted to determine i |
The results of this | feasibility study were to be reported to the 217th Gene |
of an environmental impact assessment and a | feasibility study for the Lower Sesan 2 project. |
A tunnel | feasibility study was awarded to GarverUSA which subcon |
Birmingham Conservation Trust carried out a | feasibility study on the building and became worried ab |
A cost estimate produced during the 2007 | feasibility study placed the financial cost at a maximu |
The ESO is focusing on this design after a | feasibility study concluded the proposed 100 metres (33 |
und for Ireland financed a detail study and | feasibility study into restoring the canal, which lay a |
A year-long | feasibility study completed in July 2005 identified the |
ternational Wetland Park and Visitor Centre | Feasibility Study was initiated by the Agriculture, Fis |
he said recommendation was firmed up into a | Feasibility Study which was conducted from March to Jun |
ign by Peak Rail and others culminated in a | feasibility study by Derbyshire County Council in 2004, |
ater First Minister of Scotland, launched a | feasibility study in 1999 into the re-opening of the ra |
This | feasibility study succeeded in obtaining State Governme |
A | feasibility study was commissioned and the study conclu |
pment was modernised, and in October 1991 a | feasibility study into the remote controlling of all fa |
The | feasibility study suggested the possibility of several |
The | feasibility study was completed in 2005. |
In 2005, the Wrights Company conducted a | feasibility study to return this dam to use for waterpo |
The | feasibility study report was made available in October |
The | feasibility study was completed in May 2007. |
A | feasibility study for stage two is currently underway. |
The detailed | feasibility study will be conducted by Technip. |
The | feasibility study of the pipeline was concluded in 1994 |
of Victoria - Redevelopment Masterplan and | Feasibility Study |
vieng, Cambodia Under MoU study project and | Feasibility Study by Korean company. |
The project passed a | feasibility study in December 2010. |
Lancaster County commissioned a | feasibility study in 2005 to determine the practicality |
The City of Cambridge has done a | feasibility study concerning adding a "rail with trail" |
The | feasibility study commissioned by Cornwall Council was |
A funding | feasibility study in 1989 indicated that county leaders |
expand and improve these services, after a | feasibility study into an airport rail link found the n |
The North Shore | Feasibility Study is expected to begin in January 2011. |
l link to Fleetwood via Thornton; a £30,000 | feasibility study will need to be undertaken to explore |
The | feasibility study will be carried out by Foster Wheeler |
table for a number of reasons, and a second | feasibility study, carried out by Atkins, has now ident |
The rail link, now under | feasibility study, would connect several cities in Java |
A technical | feasibility study, under the aegis of the National Park |
A technical | feasibility study, under the aegis of the National Park |
According to the | feasibility study, it is unclear whether the Port Autho |
As a result of a | feasibility study, carried out by the consulting engine |
Following completion of an 18-month | feasibility study, Jacksonville was selected by the fed |
Feasibility Study, Project Evaluation | |
The | feasibility study, by a U.S. agency, has been completed |
and the Chicago Park District considered a | feasibility study, to extend Lake Shore Drive farther n |
Stefano also remade his episode "A | Feasibility Study," retitling it "Feasibility Study" fo |
n International Cooperation Agency funded a | feasibility study. |
rade is estimated or chosen during a mining | feasibility study. |
quest for proposals for a World Bank-funded | feasibility study. |
improvements were outside the scope of this | feasibility study. |
in the UK and Scandinavia, including an NHS | feasibility study. |
orks Department with the same request for a | feasibility study. |
d in April 1998, followed by an engineering | feasibility study. |
The school has concluded a | feasibility survey which affirmed it would be possible |
Passive Underwater Fire Control | Feasibility System (PUFFS) is a passive sonar system fo |
appointed several committees to oversee the | feasibility to rehabilitate the theater. |
ing the risk, determining methods and their | feasibility to limit the spread, collecting more inform |
eactor (MSR) experiments assessed thorium's | feasibility, using thorium(IV) fluoride dissolved in a |
Main contractor for Phase A ( | feasibility) was IABG. |
ety to establish the Brian Mercer Award for | Feasibility, which is given to allow researchers to inv |
Feasibility work was funded by the North West Regional | |
こんにちは ゲスト さん
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |
こんにちは ゲスト さん
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |