出典:Wikipedia
出典:『Wikipedia』 (2009/11/08 01:56 UTC 版)
Lift Upgrading Programme (LUP) (Chinese: 电梯翻新) is a Singapore Housing and Development Board (HDB) project which upgrades and improves the facilities of the lifts at HDB flats which became an issue in the 2006 general election. This project is for housing blocks built before the year 1990, which were built with lifts that only serve some floors to meet privacy demands and to cut costs. A poll with a 75% majority (calculated among citizen households) in favor is needed for the upgrading to begin. The non-citizen residents who stay in the same HDB block have no polling rights.