意味 | 例文 (6件) |
slope diggingとは 意味・読み方・使い方
追加できません
(登録数上限)
「slope digging」の部分一致の例文検索結果
該当件数 : 6件
SLOPE FRAME TRAVELING TYPE CONSTRUCTION FACILITY, SLOPE FRAME TRAVELING TYPE HOLE DIGGING FACILITY, AND HOLE DIGGING METHOD FOR SLOPE FRAME CROSSING PART BY USE OF SLOPE FRAME TRAVELING TYPE HOLE DIGGING FACILITY例文帳に追加
法枠移動式施工設備及び法枠移動式削孔設備、並びに法枠移動式削孔設備を用いた法枠交差部の削孔方法 - 特許庁
To provide a digging work teaching device for a construction machine improving work efficiency with easy grasping of a proper target digging face even in face of slope forming work in a complicated three-dimensional landform and easy positioning for a body during digging.例文帳に追加
複雑な3次元地形における法面形成作業においても、目標とする適切な掘削面の把握が容易であり、かつ掘削時の車体の位置決めが容易で、作業効率の向上した建設機械の掘削作業教示装置を提供することにある。 - 特許庁
The term "Noborigama" is also used for "Anagama," built on a slope by digging holes or tunnels, which are used for baking Sue ware and porcelain at high temperatures.発音を聞く 例文帳に追加
一般的に丘陵などの斜面を掘り窪めたり、くりぬいたりして高火度で須恵器や陶器を焼成する窖窯(あながま)。 - Wikipedia日英京都関連文書対訳コーパス
To provide a cable crane capable of moving a traversing trolley over a wide area such as a bank body expected in construction and an energy dissipator, without requiring large-scaled digging on a rigid basis and slope surface.例文帳に追加
頑強な基礎や法面の大規模な掘削を必要とせず、建設予定の堤体及び減勢工等の広い領域にわたり、横行トロリーが移動可能であるケーブルクレーンを提供すること。 - 特許庁
The working unit 121 has the land-filling device 141 digging the slope surface 303 of the ridge 301 and a ground surface 302 forming its skirt part and land-filling soil on the ridge 301, and the ridger 131 for compacting the filled soil to form a new ridge 305.例文帳に追加
作業部121は、畦301の傾斜面303やその裾部をなす地面302を掘削して畦301に土を盛り上げる盛土装置141と、盛り上げられた土を締固めて新畦305を形成する畦形成装置131と、を有する。 - 特許庁
On this occasion, to compensate for the lack of capacity in the first plan for Wakakusa National Athletic Meet in 1984 and 'Nara Silk Road Expo' in 1988, the annex was began to be operated in 1970 using the higher storeys of Kintetsu Nara Station Building which was planned to be built at the same period, however, it decreased its necessity dramatically due to the new building of steel-reinforced concrete built in 1984 in Yoshino-tsukuri style (an architectural technique for building on a sheer cliff) by Japan National Railways, which was embedded by digging the south slope of rising ground where the main building stood, and was eventually closed in 1991 although running for a while after the closing of 'Nara Silk Road Expo.'発音を聞く 例文帳に追加
この際、当初計画に対する収容力の不足を補うため、同時期に建設が計画された近鉄奈良駅ビルの上層階を別館として1970年に営業開始したが、これは1984年のわかくさ国民体育大会、および1988年の「なら・シルクロード博覧会」の開催を控え、1984年に本館の建つ高台の南側傾斜面を削り込んで埋め込む形で鉄筋コンクリート造りの新館を国鉄の設計による吉野造りで建設したことでその必要性が大幅に低下し、「なら・シルクロード博覧会」閉幕後もしばらくは営業を続けたが、結局1991年にこの別館は閉鎖されている。 - Wikipedia日英京都関連文書対訳コーパス
-
履歴機能過去に調べた
単語を確認! -
語彙力診断診断回数が
増える! -
マイ単語帳便利な
学習機能付き! -
マイ例文帳文章で
単語を理解!
|
意味 | 例文 (6件) |
ピン留めアイコンをクリックすると単語とその意味を画面の右側に残しておくことができます。 |
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |
「slope digging」のお隣キーワード |
weblioのその他のサービス
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |