| 例文 |
Utagoを含む例文一覧と使い方
該当件数 : 7件
November 15, 1931: The Nago - Utago section (11.0 km) came into operation as an extension of the line. 例文帳に追加
1931年(昭和6年)11月15日-奈古~宇田郷間(11.0km)が延伸開業。 - Wikipedia日英京都関連文書対訳コーパス
In 1933, the Susa - Utago section came into operation and by incorporating the Mine Line's Utago - Shomyoichi - Agawa section/Shomyoichi - Senzaki section as well as the Kogushi Line, the entire portion of the Sanin Main Line consisting of the Kyoto - Hatabu section and Shomyoichi - Senzaki section opened. 例文帳に追加
1933年に須佐~宇田郷間が開業し、美禰線の宇田郷~正明市~阿川間・正明市~仙崎間と小串線を編入して京都~幡生間・正明市~仙崎間となった山陰本線が全通した。 - Wikipedia日英京都関連文書対訳コーパス
February 24, 1933: The Susa - Utago section (8.8 km) came into operation as an extension of the line, and as a result the whole line extending from Kyoto to Hatabu was opened. 例文帳に追加
1933年(昭和8年)2月24日-須佐~宇田郷間(8.8km)が延伸開業し京都~幡生間が全通。 - Wikipedia日英京都関連文書対訳コーパス
By incorporating the Utago - Shomyoichi - Agawa section and Shomyoichi - Senzaki section of the Mine Line as well as the whole of the Kogushi Line, the Kyoto - Hatabu section and Shomyoichi - Senzaki section became the Sanin Main Line. 例文帳に追加
美禰線宇田郷~正明市~阿川間、正明市~仙崎間と小串線全線を編入し京都~幡生間、正明市~仙崎間が山陰本線となる。 - Wikipedia日英京都関連文書対訳コーパス
| 例文 |
| 本サービスで使用している「Wikipedia日英京都関連文書対訳コーパス」はWikipediaの日本語文を独立行政法人情報通信研究機構が英訳したものを、Creative Comons Attribution-Share-Alike License 3.0による利用許諾のもと使用しております。詳細はhttp://creativecommons.org/licenses/by-sa/3.0/ および http://alaginrc.nict.go.jp/WikiCorpus/ をご覧下さい。 |
|
ログイン |
Weblio会員(無料)になると
|
|
ログイン |
Weblio会員(無料)になると
|