| 例文 |
flat diffusionの部分一致の例文一覧と使い方
該当件数 : 103件
To obtain a method by which contact holes 36 and 38 respectively reaching a lower diffusion layer 24, having a lower surface height and a lower wiring layer 26 having a higher surface height can be formed in the same etching step, without making the wiring layer 26 etch excessively, when the wiring layers 24 and 26 are coated with an interlayer insulating film 38 having a flat surface.例文帳に追加
表面高さが低い下部拡散層24と表面高さが高い下部配線層26が、表面が平坦な層間絶縁膜38に被覆されている場合に、それぞれが下部拡散層24と下部配線層26に達するコンタクトホール36と38を、表面高さが高い下部配線層26を過剰にエッチングせず、しかも、同一のエッチング工程で形成できる方法を開発する。 - 特許庁
A structure composed by diffusion-bonding a thin metal sheet 102 having an annular pattern 201 and a bridge part 202 onto a metal fiber sheet 101 composed by forming a metal fiber into a sheet-like shape is employed for this electrode 103 for a fuel cell used for a flat stack type fuel cell having a structure where a basic unit cells are flatly arranged and connected in series to one another.例文帳に追加
基本単位セルが平面的に並べられて直列接続された構造を有する平面スタック型の燃料電池に利用される燃料電池用電極103として、金属繊維を板状に成形した金属繊維シート101上に環状パターン201とブリッジ部202を備えた薄板金属102を拡散接合させた構造を採用する。 - 特許庁
To effectively restrain diffusion of sediment and pollution of a surrounding water area caused by dredging by serviceably dredging as a planned level by making a dredged water bottom surface substantially flat without requiring a large glove required in conventional dredging by continuously forcibly feeding up to a dredging sediment storage means on a water surface by scraping up while leveling deposit sediment of the water bottom in response to an advance of a work mother ship.例文帳に追加
作業本船の前進に応じて水底の堆積土砂を均しながら掻き集めて水面上の浚渫土砂貯溜手段まで連続的に圧送できるようにして、従来の浚渫で必要とした大型のグラブ等が不要となり、また浚渫後の水底面が略平坦として浚渫を計画レベル通りに無駄なく行うことが可能となり、更に浚渫に伴う周辺水域の土砂拡散、汚濁を効果的に抑える。 - 特許庁
| 例文 |
| Copyright © Japan Patent office. All Rights Reserved. |
|
ログイン |
Weblio会員(無料)になると
|
|
ログイン |
Weblio会員(無料)になると
|