例文 (52件) |
excavation pitの部分一致の例文一覧と使い方
該当件数 : 52件
Article 407 The employer shall, when carrying out the excavating work for quarrying (excluding the work in a pit, hereinafter the same shall apply in this Article), make the gradient of the said excavation surface the value listed in the right column of the following table or less corresponding to the type of natural ground listed in the left column of the same table and the height of the excavation surface listed in the middle column of the same table respectively. However, this shall not apply to the case of carrying out the excavating work using an excavating machines such as a power shovel and a tractor shovel, and when it is unlikely to cause danger to the operator of the said excavating machine due to collapse of natural ground or fallen earth and rocks: 例文帳に追加
第四百七条 事業者は、岩石の採取のための掘削の作業(坑内におけるものを除く。以下この条において同じ。)を行なうときは、掘削面のこう配を、次の表の上欄に掲げる地山の種類及び同表の中欄に掲げる掘削面の高さに応じ、それぞれ同表の下欄に掲げる値以下としなければならない。ただし、パワー・シヨベル、トラクター・シヨベル等の掘削機械を用いて掘削の作業を行なう場合において、地山の崩壊又は土石の落下により当該機械の運転者に危険を及ぼすおそれのないときは、この限りでない。 - 日本法令外国語訳データベースシステム
Displacement measurement in the tunnel elongation direction is performed, aimed at a working face after excavation by a total station 5, capable of measuring a distance and an angle installed in a tunnel pit, and the final displacement is predicted, based on the correlation data between displacement speed in the tunnel elongation direction held beforehand and the final displacement.例文帳に追加
トンネル坑内に設置された測距及び測角が可能なトータルステーション5により、掘削後の切羽面を対象としてトンネル延長方向の変位計測を行い、事前に保有しているトンネル延長方向の変位速度と最終変位量との相関データに基づき、最終変位量を予測する。 - 特許庁
例文 (52件) |
Copyright © Japan Patent office. All Rights Reserved. |
※この記事は「日本法令外国語訳データベースシステム」の2010年9月現在の情報を転載しております。 |
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |