意味 | 例文 (14件) |
岡原の英語
追加できません
(登録数上限)
英訳・英語 Okaharu
「岡原」を含む例文一覧
該当件数 : 14件
中部電力株式会社浜岡原子力発電所1,2号機例文帳に追加
Units 1 and 2 of the Hamaoka Power Station of Chubu Elec) tric Power Co., Inc. - 経済産業省
時の宇都宮当主、宇都宮持綱を自領の幸岡原に狩りに招いて殺害。例文帳に追加
They invited Mochitsuna UTSUNOMIYA, who was then the family head of the UTSUNOMIYA clan, to go hunting in the Koka-hara plain, in their own domain, and there they killed him.発音を聞く - Wikipedia日英京都関連文書対訳コーパス
浜岡原発は中部電力で唯一の原発であり,同社の供給力の1割以上を占める。例文帳に追加
The Hamaoka plant is Chubu Electric's only nuclear power station and accounts for more than 10 percent of the company's supply capacity.発音を聞く - 浜島書店 Catch a Wave
浜岡原子力発電所における耐震裕度向上工事は、この例である。例文帳に追加
An example of this is the construction work for improvement of the seismic safety margin at the Hamaoka Nuclear Power Station. - 経済産業省
(イ)全国の原子力施設の安全性・安心を高める取組(緊急安全対策、浜岡原子力発電所の停止要請等)例文帳に追加
(b) Implemented measures to enhance the safety and security of nuclear power facilities throughout Japan (implemented emergency safety measures, requested the shutdown of the Hamaoka Nuclear Power Station, etc.) - 経済産業省
今後、中部電力株式会社浜岡原子力発電所において、プルサーマルによる発電が実施される予定である。例文帳に追加
In the future, Hamaoka Nuclear Power Station of Chubu Electric Power Co., Inc.is also expected to adopt the plu-thermal program. - 経済産業省
例えば、2009年8月に発生した駿河湾沖地震では、震央に近接する浜岡原子力発電所が地震の影響を受け、運転中の原子炉が緊急停止した。例文帳に追加
In the Surugawan-oki Earthquake in August 2009, the Hamaoka Nuclear Power Station adjacent to the epicenter was affected by the earthquake, and the nuclear reactors in operation were scrammed. - 経済産業省
-
履歴機能過去に調べた
単語を確認! -
語彙力診断診断回数が
増える! -
マイ単語帳便利な
学習機能付き! -
マイ例文帳文章で
単語を理解!
「岡原」を含む例文一覧
該当件数 : 14件
退却した薩軍は都城に集結していると予測した川村参軍は6月29日、別働第1旅団を海上から垂水・高須へ、第4旅団を吉田・蒲生へ、別働第3旅団を岡原・比志島経由で蒲生へ進め、都城を両面攻撃することとした。例文帳に追加
Predicting that the retreated Satsuma army were concentrated in Miyakonojo, Sangun KAWAMURA decided on June 29 to advance the detached 1st brigade to Tarumizu and Takasu by sea, the 4th brigade to Yoshida and Kamo, and the detached 3rd brigade to Kamo via Okaharu and Hishijima, to attack Miyakonojo from two sides.発音を聞く - Wikipedia日英京都関連文書対訳コーパス
我が国では、政府の要請に基づき、30年以内にマグニチュード8程度の地震が発生する可能性が87%と、他の原子力発電所と比較して際だって高い浜岡原発の運転の停止を中部電力が決定しました。例文帳に追加
In Japan, responding to the request by the government, the Chubu Electric Power Company has decided to halt operations of the Hamaoka nuclear power plant which is exposed to a substantially higher risk than the other plants are, because the Hamaoka site is scientifically expected to get hit by a big earthquake of approximately the level 8 magnitude on the Richter scale within 30 years, with 87% probability.発音を聞く - 財務省
この枠組みにおいて、東京電力㈱福島第一原子力発電所3号機、中部電力㈱浜岡原子力発電所1号機及び関西電力㈱美浜発電所3号機について、高経年化技術評価等報告書の提出があった。例文帳に追加
The aging technical evaluation reports for Unit 3 of the Fukushima Daiichi Nuclear Power Station of Tokyo Electric Power Co., Inc., Unit 1 of the Hamaoka Nuclear Power Station of Chubu Electric Power Co., Inc., and Unit 3 of the Mihama Power Station of the Kansai Electric Power Co., Inc.have already been submitted in this framework. - 経済産業省
中部電力は、浜岡原子力発電所に設置された5基の原子炉施設について、耐震裕度の向上を図るための工事について検討していたが、1号機及び2号機については、自主的に目標としている地震動に対応するためには、相当な工事費用と工事期間を要するとの結論に達し、耐震裕度向上工事を実施した上で運転を再開し ても、経済的性に乏しいと判断した。例文帳に追加
Chubu Electric Power Company was initially studying an improvement work for increasing the seismic margin of five reactor facilities installed in the Hamaoka Nuclear Power Station. However, for Units 1 and 2, the power company concluded that it would require a considerable work cost and a long work period in order to make them resistant to the voluntary set target of the ground motion, and determined that it would hardly be economical if the operation were resumed after the improvement work for increasing the seismic margin. - 経済産業省
例えば、中部電力では「失敗に学ぶ回廊」を浜岡原子力発電所の訓練施設内に設置し、事故・トラブル概要を示すパネルや実物または模型の展示、トラブル対応した職員のメッセージファイル、当時の新聞記事が掲示されており、過去に経験した事故・トラブルから学んだ教訓、これまで蓄積してきたノウハウを風化させることなく技術伝承していくために、職員の研修に活用している。例文帳に追加
For example, Chubu Electric Power Co.,Inc. built a “Corridor for Learning from Failures” in the training facility at Hamaoka Nuclear Power Station. In this space, along with the panels describing summaries of accidents and troubles, actual items and models, messages from the personnel who addressed the troubles, and newspaper articles at the time are on display and effectively used for personnel training so that lessons learned from the past accidents and troubles and the accumulated technical know-how are handed down without being forgotten. - 経済産業省
原子力安全・保安院は、2006年1月31日に中部電力㈱浜岡原子力発電所1号機の技術評価及び長期保全計画の評価を行い、2006年5月に技術評価実施の体制は妥当であること、実施した高経年化の技術評価、耐震安全性の確保に関する技術評価及び保全対策は妥当であること及び技術評価に基づく長期保全計画は妥当であることを原子力安全委員会に報告した。例文帳に追加
NISA assessed the technical evaluation report and the long-term maintenance program for Unit 1 of the Hamaoka Nuclear Power Station of Chubu Electric Power Co., Inc. on January 31 2006. Then, NISA reported the results to the NSC in May 2006 that the system for implementing the technical evaluation is appropriate, that the technical evaluation implemented for aging, the technical evaluation for ensuring seismic safety, and conservation measures are appropriate, and that the long-term maintenance program based on the technical evaluation is appropriate. - 経済産業省
浜岡原子力発電所では、想定東海地震(マグニチュード8.0)を上回る安政東海地震(マグニチュード8.4)やこれを上回る地震(マグニチュード8.5)を踏まえ、600ガルの地震動(岩盤上における地震の揺れ)に対しても、耐震安全性を確保しているが、最新の知見を反映し、その耐震裕度を向上させていくことが重要であるとの認識により、平成13年7月から開始された国の耐震設計審査指針改訂の審議を契機として、自主的に耐震裕度向上工事を実施した。例文帳に追加
The Hamaoka Nuclear Power Station had ensured seismic safety to withstand an earthquake ground motion (vibration on the bedrock) of 600 gal, taking into consideration the Ansei-Tokai earthquake (magnitude of 8.4) exceeding a possible Tokai earthquake (magnitude of 8.0), and a larger earthquake (magnitude of 8.5), but in light of the deliberations by the national government on the revision of the Regulatory Guide for Reviewing Seismic Design of Nuclear Power Reactor Facilities that started in July 2001, the licensee of the reactor operation carried out the seismic margin improvement work voluntarily, recognizing that it is important to improve the seismic safety margin, reflecting the latest findings. - 経済産業省
|
意味 | 例文 (14件) |
|
岡原のページの著作権
英和・和英辞典
情報提供元は
参加元一覧
にて確認できます。
All Rights Reserved, Copyright © Japan Science and Technology Agency | |
Copyright © 2024 CJKI. All Rights Reserved | |
This page uses the JMnedict dictionary files. These files are the property of the Electronic Dictionary Research and Development Group, and are used in conformance with the Group's licence. |
ピン留めアイコンをクリックすると単語とその意味を画面の右側に残しておくことができます。 |
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |
weblioのその他のサービス
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |