意味 |
鉄道路線が津軽海峡の下を通って北海道まで延長された。の英語
追加できません
(登録数上限)
Weblio例文辞書での「鉄道路線が津軽海峡の下を通って北海道まで延長された。」に類似した例文 |
|
鉄道路線が津軽海峡の下を通って北海道まで延長された。
The Hokutosei started service in 1988 as the Seikan Tunnel connecting Hokkaido and Honshu was completed.
Forty-three years have passed since the start of the Hokkaido Shinkansen Line development project.
The Tohoku Shinkansen Line stopped its service for a while along some sections north of Sendai Station.
The new line is scheduled to open in March 2016 between Shin-Aomori and Shin-Hakodate-Hokuto stations.
Hokkaido Railway Company (JR Hokkaido), for example, has sold nearly 40 train cars to Myanmar's national railway.
This March, the Hokutosei's regular operations came to an end because the Hokkaido Shinkansen Line is set to begin operations soon.
This gives passengers from southwestern Tokyo better access to Shinkansen trains.
It is long since the railway was completed between Bakan and Aomori.
With the reopening of the railway's last remaining disconnected section, Sanriku Railway resumed full operation.
Hokkaido Shinkansen Debuts
The Asakaze, an express train with sleeping berths, has made the trip between Tokyo and Shimonoseki for half a century.
The line was extended step by step and finally linked Tokyo Station with Shin-Aomori Station in December 2010.
This line was extended from Hachinohe to Shin-Aomori to complete the line as it was proposed in 1972.
The North-Eastern Line starts at Ueno, and terminates at Aomori.
意味 |
|
鉄道路線が津軽海峡の下を通って北海道まで延長された。のページの著作権
英和・和英辞典
情報提供元は
参加元一覧
にて確認できます。
Tatoebaのコンテンツは、特に明示されている場合を除いて、次のライセンスに従います: Creative Commons Attribution (CC-BY) 2.0 France |
ピン留めアイコンをクリックすると単語とその意味を画面の右側に残しておくことができます。 |
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |
「鉄道路線が津軽海峡の下を通って北海道まで延長された。」のお隣キーワード |
weblioのその他のサービス
ログイン |
Weblio会員(無料)になると 検索履歴を保存できる! 語彙力診断の実施回数増加! |