| 例文 |
completion valueの部分一致の例文一覧と使い方
該当件数 : 376件
A controller in the injection apparatus measures a filling and pressure rising completion time Tc from a time point F at which gate resistance is generated to a time point M at which the molten metal pressure reaches a prescribed set pressure Pt, and thereafter based on the measurement result, the movement of an injection cylinder is controlled so that the filling and pressure rising completion time Tc becomes a targeted value.例文帳に追加
射出装置の制御装置は、ゲート抵抗が生じる時点Fから溶湯の圧力が所定の設定圧力Ptに到達する時点Mまでの充填昇圧完了時間T_Cを計測し、その計測結果に基づいて、以降において充填昇圧完了時間T_Cが目標値になるように射出シリンダの動作を制御する。 - 特許庁
To prevent a driving current value and a target current value from deviating from each other at such timing as to reach a conduction completion angle when energizingly-controlling a driving current of a motor to be a target current in a predetermined control period by PWM control, by switching a driving phase of the motor according to a rotational angle of a rotor.例文帳に追加
ロータの回転角度に応じてモータの駆動相を切り替え、PWM制御により所定の制御周期でモータの駆動電流を目標電流に通電制御する際に、前記通電終了角に到達するタイミングにおいて駆動電流値と目標電流値とがずれないようにする。 - 特許庁
For example, if the job data generated does not match setting information when the setting completion of the job is accepted at an operating unit or if a data value (number of copies/number of destinations of transmission) included in the job data is equal to or larger than a prescribed value, there may arise a probability that the job data have been tampered with by a computer virus.例文帳に追加
たとえば、生成されたジョブデータと、操作部でジョブの設定完了を受けたときの設定情報が一致しない場合や、ジョブデータに含まれているデータ値(印刷部数/送信宛先数)が所値以上の場合などは、コンピュータウイルスによってジョブデータが改竄されている可能性がある。 - 特許庁
A voltmeter 19, which detects the voltage between the connection part of the pre-charge contactor 16 and the pre-charge resistor 17 of the power supply unit and the negative pole of the battery pack 10, is provided to determine pre-charge completion based on the voltage detected value immediate before the pre-charge of the voltmeter 19 and the voltage detected value during pre-charge of the voltmeter.例文帳に追加
こうした電源装置のプリチャージコンタクタ16とプリチャージ抵抗17との接続部と、組電池10の負極との電圧を検出する電圧計19を設け、その電圧計19のプリチャージ直前の電圧検出値とプリチャージ中の電圧検出値とに基づいてプリチャージ完了判定を行うようにした。 - 特許庁
The tolerable preservation time calculation part 102 calculates the tolerable preservation time on the basis of a tolerable SOH deterioration amount, an SOC value required at the completion of charging processing in order to run a vehicle according to a running schedule, and a correspondence between an elapsed time and an SOH deterioration amount corresponding to the required SOC value.例文帳に追加
許容保管時間は、許容保管時間算出部102にて、許容SOH劣化量と、車両が運行計画に従って運行されるために充電処理終了時点において必要なSOC値と、当該必要SOC値に対応する、経過時間とSOH劣化量との対応関係とに基づいて算出される。 - 特許庁
This method can facilitate the recognition of the current value and the target value set by the user in the process of control and facilitate the confirmation of the status of the controlled object to eliminate the risk of unnecessarily confusing the user and explicitly show the completion of control.例文帳に追加
従ってこの方法において、例えば制御の途中の現在値や使用者が設定した目標値を容易に確認することができ、また制御対象の状況の把握も容易になり、使用者に無用な混乱を与える恐れが解消されると共に、制御の完了なども明示することができる。 - 特許庁
The apparatus includes: a harmonic meter 7 that detects a primary side voltage of a furnace transformer 2 of the arc furnace and obtains a harmonic voltage component of a frequency which is an even multiple of the fundamental frequency; and a control device 4 that determines the completion of melting scrap when a voltage value of the harmonic voltage component is lower than a predetermined value.例文帳に追加
アーク炉の炉用変圧器2の一次側電圧を検出して基本周波数の偶数倍の周波数の高調波電圧成分を得る高調波計7と、上記高調波電圧成分の電圧値が所定値よりも低下したことでスクラップの溶解完了と判定する制御装置4と、を備えている。 - 特許庁
The coasting control device includes an accelerator opening speed learning means 6 expanding a threshold value range set in a coasting control start condition or a coasting control completion condition in accordance with a level of accelerator opening speed when a predetermined learning start condition is satisfied and the accelerator opening speed becomes outside the threshold value range.例文帳に追加
所定の学習開始条件を満たし、かつ、アクセル開度速度が、惰行制御開始条件、あるいは惰行制御終了条件で設定されているしきい値範囲外となったとき、当該アクセル開度速度の大きさに応じて、前記しきい値範囲を拡大するアクセル開度速度学習手段6を備えた。 - 特許庁
A recovery record 160 includes the storage allocation information 162 related to the change in the system configuration of the storage allocation; a completion indicator 164 includes a first value when the storage allocation information is included in system components and includes a second value when the storage allocation information is not included in the system components.例文帳に追加
回復記録(160)は記憶割振りのシステム構成内の変化に関連する記憶割振り情報(162)を含み、完了標識(164)は、記憶割振り情報がシステム構成要素以内に含まれるときは第1の値を含み、記憶割振り情報がシステム構成要素以内に含まれないときは第2の値を含む。 - 特許庁
Before the completion of the movement by the specified moving amount (S10), an alarm is output (S11) under the interpretation that the resin viscosity is high and the screw is overloaded when a monitoring time is over (S8) or a positional deviation exceeds a monitored value (S9).例文帳に追加
所定量移動完了する(S10)前に、監視時間が経過したとき(S8)、又は位置偏差が監視値を越えたとき(S9)には、樹脂粘度が高くスクリュに過負荷がかかっているとしてアラームを出力する(S11)。 - 特許庁
A correction quantity Δ(N) including the wear of the grinding wheel and the thermal deformation and elastic deformation of a machine is found from the original point value pair S(0), X(0) and the machining completion point pair S(N), X(N), and a machining pattern PP_std is shifted onto the table 11 side by the correction quantity Δ(N) portion.例文帳に追加
原点値対S(0)、X(0)と加工完了点対S(N)、X(N)から、砥石磨耗と機械の熱変形と弾性変形を含んだ補正量Δ(N)を求め、補正量Δ(N)分だけ加工パターンPP_stdをテーブル11側にシフトする。 - 特許庁
When the completion scheduled time of a certain independent product in the production line is determined, the production start time of the product is acquired from a production schedule, and the value of the relative time 106 corresponding to the time is determined from the relative time table.例文帳に追加
生産ラインにおけるある個別製品の完成予定時刻を求める場合、生産スケジュールからその製品の生産開始時刻を取得し、相対時刻テーブルからその時刻に対応する相対時刻106の値を求める。 - 特許庁
At the timing of completion of discrimination of T2/FEF represented by the triangle 103, the T2 frame is identified by discrimination result of T2/FEF, a correction control part applies a detection value detected by error detection to between the triangle 101 and the triangle 103.例文帳に追加
そして、三角形103が示すT2/FEFの判別完了したタイミングで、T2/FEF判別結果よりT2フレームであることがわかるので、補正制御部は、三角形101と三角形103の間で、誤差検出された検出値を適用する。 - 特許庁
A project construction completion value calculation part 86 receives progress states by completed processes from a project progress management table 82 and receives contract amount information of implemented processes from the project implementation history table 83.例文帳に追加
プロジェクト工事済価値算出部86は、プロジェクト進捗管理テーブル82から実施済みの工程毎の進捗状況を受取ると共に、プロジェクト履行履歴テーブル83から実施済み工程の請負契約金額情報を受取る。 - 特許庁
An initial value for the counter NFCRD corresponding to a switching completion time required for switching a cylinder resting mechanism is set in accordance with an engine rotation speed NE and the temperature TOIL of operating oil for operating the cylinder resting mechanism.例文帳に追加
カウンタNFCRDの初期値は、気筒休止機構の切り換え動作に要する切り換え完了時間に対応しており、エンジン回転数NE及び気筒休止機構を作動させる作動油の温度TOILに応じて設定される。 - 特許庁
At this time, the control part 8 changes a possible power generation value of the fuel cell stack 1 for determining the completion of the warm-up of the fuel cell stack 1 depending on the state of operation after the start of the system is finished.例文帳に追加
このとき、制御部8は、システム起動完了後の運転状態に基づいて、燃料電池スタック1の暖機が完了したことを判定するための燃料電池スタック1の発電可能電力の判定値を変更する。 - 特許庁
When a write command is issued and when a value of the timer 161 that starts measurement from completion of previous writing exceeds a predetermined time, a new block reserve determination means 170 newly reserves a physical block and performs writing.例文帳に追加
書き込みコマンドが与えられたときに、前回の書き込みの完了から計測を開始していたタイマ161の値が所定の時間を超えたときに、新ブロック確保判断手段170が新たに物理ブロックを確保して書き込みを行う。 - 特許庁
In this case, the luminance is controlled by a light source control part so as to reach a predetermined luminance value, later than a time point (time t1) of the completion of liquid crystal response and before the time (time t2) of switching of lighting of the linear light-emitting region.例文帳に追加
このとき、光源制御部は、液晶の応答が完了する時点(時間t1)よりも遅く、かつ線状発光領域の点灯切替時(時間t2)までの間に前記輝度が設定輝度に到達するように制御する。 - 特許庁
An assist information start time calculation means estimates a time necessary for completion of operation of the GUI based on a value of the parameter obtained as the result of analysis, thereby determining a time for determining that the user is in trouble.例文帳に追加
アシスト情報開始時間算出手段は、分析の結果得られたパラメータの値に基づき、当該GUIの操作を完了するのに必要な時間を推定することで、ユーザーが困っている状態であると判定する時間を求める。 - 特許庁
Thereafter, a sub F/B correction quantity is read (step 114), and re-learning of the sub F/B learning value is executed by releasing the completion of the sub F/B learning (step 118) when the sub F/B correction quantity is more than a prescribed region.例文帳に追加
その後、サブF/B補正量を読み込み(ステップ114)、そのサブF/B補正量が所定範囲以上である場合には、サブF/B学習の完了を解除し(ステップ118)、サブF/B学習値の再学習を実行する。 - 特許庁
A pixel signal in a first accumulating period is compared with a reference signal RAMP, count processing is performed at any of down and up modes in parallel to this comparing processing, and a count value at the time of the completion of the comparing processing is held.例文帳に追加
第1の蓄積期間下の画素信号と参照信号RAMPとを比較するとともに、この比較処理と並行してダウン/アップの何れかのモードでカウント処理を行ない、この比較処理が完了した時点のカウント値を保持する。 - 特許庁
A sphygmomanometer is equipped with a display means which can display a signal level of a pulse wave detected from the start of the measurement of the blood pressure value until the completion of the measurement by a time series graph.例文帳に追加
本発明に係る血圧計は、血圧値の測定開始から測定終了に至るまでに検出された脈波の信号レベルを、時系列のグラフで表示することのできる表示手段を備えることを特徴とする。 - 特許庁
To provide a living body sample detector capable of preventing the error of the measured value between the starting point of a measuring flow channel and the completion point thereof even when a plate is made eccentric to produce the positional shift of the plate with respect to an optical unit.例文帳に追加
プレートが偏心してプレートと光学ユニットとの位置ずれが生じた場合でも、測定流路の開始点から終了点までの間の測定値の誤差を抑えることができる生体サンプル検出装置を提供する。 - 特許庁
If the value LAMBDAAVE falls within the set range, it is judged that the present learning range learning is completed (S506), and whether the learning completion judging range number is a set range number or more or not is checked (S507).例文帳に追加
そして、平均値LAMBDAAVEが設定範囲内の場合、現在の学習領域の学習完了と判定し(S506)、学習完了判定領域数が設定領域数以上あるか否かを調べる(S507)。 - 特許庁
A control device defines an end surface position of the bellows 20 after injection completion at which end surface vibration quantity of the bellows 20 gets within a predetermined value as measurement start position of injection quantity and starts actual injection quantity measurement from the measurement start position.例文帳に追加
制御装置は、ベローズ20の端面振動量が所定値以内になった噴射終了後のベローズ20の端面位置を噴射量の計測開始位置とし、この計測開始位置から実際の噴射量計測を開始する。 - 特許庁
In restoring the exhaust throttle valve, a restoration operation start to the opening side of the exhaust throttle valve is delayed up to a time at which an A-time elapses from the regeneration completion of the PM filter, and an engine revolution speed is lowered by a predetermined value (timing t2).例文帳に追加
排気絞り弁の復帰に際しては、PMフィルタの再生終了時からA時間が経過してエンジン回転速度が所定量低下する時点(タイミングt2)まで、排気絞り弁の開き側への復帰動作開始を遅延させる。 - 特許庁
If patient ID information is inputted in an ID information inputting part 80, the main read control part 50 instructs a power supply 52 to start power supply to a CCD line sensor 40, also sets a prescribed time value showing start completion in the CCD line sensor 40 with respect to a start completion detecting part 54 and operates a timer for clocking the prescribed time.例文帳に追加
ID情報入力部80において患者のID情報が入力されると、読取部主制御部50は電力供給部52に対してCCDラインセンサ40への電力供給の開始を指示するとともに、起動完了検出部54に対してCCDラインセンサ40に起動完了を示す所定時間値をセットし、該所定時間を計時するタイマを作動させる。 - 特許庁
In the accelerated weatherability test method for arranging a sample inside a case and performing accelerated weatherability test by irradiation from an artificial light source, illumination value is measured with time, integrated light quantity is continuously calculated with time based on the data of the temporal illumination value, and the artificial light source is turned off with reference to the completion of the test when the integrated light quantity reaches a certain value set previously.例文帳に追加
筐体の内部に試料を配置して人工光源からの照射によって促進耐候性試験を行う促進耐候性試験方法において、経時的に照度値を測定し、該経時的な照度値のデータより積算光量を経時的に算出し続け、試験の完了に係る該人工光源の消灯を、事前に設定した一定値に該積算光量が至った際に行うことを特徴とする。 - 特許庁
To provide a battery control method with high reliability in the calculation of an effective voltage value of a charging/discharging voltage by which completion of increasing capacitor component can be discriminated at charging/ discharging of a battery in a hybrid electric vehicle.例文帳に追加
ハイブリッド電気自動車において、バッテリーの充/放電時にキャパシタ成分の増加が完了する時点を判別することができるようにし、充/放電電圧の有効電圧値の算出に信頼性の高いバッテリー管理方法を提供する。 - 特許庁
The message handling module also has a transmission completion detector operable to detect in dependence upon a message receipt indicator value that the message has been received by all of the at least two destination processor cores and to initiate transmission of an acknowledgement signal to the source processor core.例文帳に追加
メッセージ処理モジュールは、前記宛先プロセッサ・コアの全てが前記メッセージを受信したことを前記表示器値に従って検出して、前記発信元プロセッサ・コアへの応答信号の送信を開始する送信完了検出器も有する。 - 特許庁
An operation data processing unit 11B compares the pixel signal of a reading period of n lines with a reference signal RAMP, performs count processing at any of down and up modes in parallel to this comparing processing, and holds a count value at the time of completion of the comparing processing.例文帳に追加
演算データ処理部11Bでは、n行の読出期間の画素信号と参照信号RAMPとを比較するとともに、この比較処理と並行してダウン/アップの何れかのモードでカウント処理を行ない、比較処理が完了した時点のカウント値を保持する。 - 特許庁
Then, a preset set value ADVRTD1 of an ignition time timing delay correction amount is set as the ignition time timing delay correction amount ADVRTD (S8), and timing delay correction control of the ignition time just after the completion of the lock up is performed (S9).例文帳に追加
そして、点火時期遅角補正量ADVRTDとしてあらかじめ設定された点火時期遅角補正量設定値ADVRTD1を設定し(S8)、ロックアップ完了直後の点火時期の遅角補正制御を実行する(S9)。 - 特許庁
After confirming the completion of frequency synchronization at the phase convergence point, the correction value of the convergence point is updated by a phase convergence point modifier 16, thus bringing the phase difference closer to a final, preset, target phase convergence point gradually.例文帳に追加
その位相収束点のもとでの周波数同期完了を確認した後,位相収束点変更部16によって収束点の補正値を更新し,位相差をあらかじめ設定された目的とする最終位相収束点に徐々に近づける。 - 特許庁
A workpiece counter indicating the number of machined workpieces is counted up by 1 (S19), the tool number of the spare tool used for the machining and the value of the workpiece counter are stored in the work memory of a RAM 53 (S20), and a cycle completion signal is output (S21).例文帳に追加
加工終了したワークの個数を示すワークカウンタを1だけカウントアップさせ(S19)、加工に使用した予備工具の工具番号とワークカウンタの数値をRAM53のワークメモリに記憶させて(S20)、サイクル終了信号を出力する(S21)。 - 特許庁
When the present location X1n or the present location X2n are completion location (YES in a step S2-60), the CPU makes the reflecting light En a pixel value (step S2-65) and completes fused image data generating processing on one pixel constituting a frame.例文帳に追加
現在位置X1n 又は現在位置X2n が終了位置であるとき(ステップS2−60でYES)、CPUは反射光En をピクセル値とし(ステップS2−65)、フレームを構成する1ピクセルについての融合画像データ生成処理を終了する。 - 特許庁
Before starting the job, a log management section 45 sums up an approximate estimate of a data quantity of logs that is generated until the completion of the job and a data quantity of all logs stored in a HDD 65 and decides if the sum total exceeds a specified value.例文帳に追加
ログ管理部45は、ジョブの開始前に、当該ジョブの完了までに発生するログのデータ量の概算と、HDD65に記憶されている全てのログのデータ量とを合計し、当該合計が規定値を超えているか否かを判断する。 - 特許庁
When a frequency of transfer to the memory from the input buffer reaches the specified value, The DMA controller generates an interrupt signal 1 indicative of the fact, and generates an interrupt signal 3 indicative of the completion of reception at time of elapsing specified time from transfer.例文帳に追加
DMAコントローラは、入力バッファからメモリへの転送回数が所定値に達したときに、その旨を示す割り込み信号(1)を発生し、また、転送から所定時間が経過した時点で、受信の終了を示す割り込み信号(3)を発生する。 - 特許庁
A peak value of attenuated vibration like tension fluctuation of the endless belt 28 is prevented from being excess and slip of the endless belt 28 can be suppressed by generating regular torque via torque output cessation time after completion of reverse torque generation.例文帳に追加
逆トルクの発生の終了後にトルク出力休止時間を介して正トルクを発生させることで、無端ベルト28の減衰振動的張力変動のピーク値が過大になるのを防止して無端ベルト28のスリップを抑制することができる。 - 特許庁
The data regarding the completion of so-called full-set projects—such as large-value plants—by regions show there are many such projects in Africa (62.9% in 2005). This suggests that China concentrates its aid in Africa (see Figure 3-5-17).例文帳に追加
援助のうち、通常資金規模が大きい、プラント建設等のいわゆるフルセット型事業の完成案件の地域別分布で見ると、アフリカの案件が多く(2005年62.9%)、中国がアフリカに重点的に援助を向けていることが推定できる51(第3-5-17図)。 - 経済産業省
The part 13 rewrites a flag corresponding to one's own VPI value to be '1', rewrites a response message part into response data, which is received from the MPU 14 and transfers it to a node at a downstream side via the ATM switch 11 after the completion of rewriting.例文帳に追加
ユーザセル送信部13は自身のVPI値に対応するフラグを“1”に書換え、さらに応答メッセージ部をMPU14から受信した応答データに書換え、書換え完了後、ATMスイッチ11を介して下流側のノードに転送する。 - 特許庁
A product developing and selling enterprise enables processing on the Internet concerning a symbol for each form of a product made to order to contract a producer for production to order/delivery at each of places or examination success reference value/product registration image in the completion of production.例文帳に追加
製品開発販売企業は受注製造・納品する製造業者を各地で契約する受注製品の形式毎の記号とか製造完了時の検査合格基準値・製品登録画像などをインターネット上で処理可能にしておく。 - 特許庁
Idle circuits 108-1, 108-2, depending on an idle operation completion signal 113, control a data input state to the integrated circuit in an idle state of holding a previous value or the previous value being reversed, until a time point that the power supply voltage stabilization determination circuit detects a state that the power supply voltage is stabilized from a start time point of clock control timing.例文帳に追加
アイドル回路108−1、108−2は、アイドル動作完了信号113に基づいて、クロック制御タイミングの開始時点から電源電圧安定化判定回路が電源電圧が安定する状態を検出する時点まで、集積回路へのデータ入力状態を前値保持又は前値反転のアイドル状態に制御する。 - 特許庁
An initial offset value of the offset is determined based on a number of retransmissions of an initial ranging code performed until an initial ranging process is completed, a unit transmission power used for retransmission of the initial ranging code, and a power correction value received from the ABS upon completion of the initial ranging process with the ABS.例文帳に追加
上記オフセットの初期値は、初期レンジングプロセスが完了するまで実行した初期レンジングコードの再送信回数と、初期レンジングコードの再送信のために使用される単位送信電力と、上記進歩した基地局と初期レンジングプロセスを完了する際に進歩した基地局から受信した電力調整値とに基づいて決定される。 - 特許庁
The calculator automatically calculates the start points of time of urination and completion points of time of urination related to individual urinations in the collected measured value data on the basis of a predetermined first standard to form the time series data related to the generation points of time of urination and urination quantities in the measured value data transmitted from the respective electronic balances.例文帳に追加
上記計算機は、所定の第1の基準により、収集された測定値データにおいて、個々の排尿に関する排尿開始時点と排尿終了時点を自動確定し、よって、夫々の電子天秤から送信されてくる測定値データにおいて、排尿発生時点及び排尿量に係る時系列データを形成する。 - 特許庁
A motor control device 60 executes the stop process storing an absolute position of the control shaft 21 after completion of rewriting as a final value, rewriting the flag to another value, and stopping electricity supply to the control part 61 when engine stop operation is performed during rewriting of the flag accompanied by engine start operation.例文帳に追加
モータ用制御装置60は、機関始動操作に伴うフラグの書き換え中に機関停止操作が行われたときには、その書き換えが完了した後、コントロールシャフト21の絶対位置を終了値として記憶し、フラグを他方の値に書き換え、フラグが一方の値から他方の値に書き換えられると制御部61への給電を停止する停止時処理を実行する。 - 特許庁
A control device 10 determines the set value of the heating quantity of the present time based on the difference between the actual temperature and the target temperature of the molten metal at the previous heating completion time, the difference between the previous temperature and the present temperature of the melting tank 2 before charging the raw material, and the difference in the atmospheric temperature.例文帳に追加
制御装置10は、前回の加熱終了時点における溶湯の実績温度と目標温度の差、前回と今回の原料投入前の溶融槽2の温度の差及び雰囲気温度の差に基づいて、今回の加熱量の設定値を決定する。 - 特許庁
In S23, a management server 2 adds scores to events for a storefront terminal 1, a printer 3, a network 8 that have occurred during a set of an activation-start time and an activation-completion time that are detected, and calculates a total point as a totaled value of scores of respective events.例文帳に追加
S23では、管理サーバ2は検出した起動開始時刻と起動完了時刻のセットの間において発生した店頭端末機1、プリンタ3、ネットワーク8のイベントに対する点数を付与し、各イベントの点数を総和した値である集計点を算出する。 - 特許庁
Then, upon confirming the completion of test with the value of the test status register, the CPU reads the test results from the test circuits for determination, and determines whether to continuously perform the test according to setting of the test general register for continuity of the test.例文帳に追加
この後、CPUは、テスト状態レジスタの値によりテストが行われたことを確認すると、テスト回路よりテスト結果を読み出して判定を行い、テスト汎用レジスタの設定に従って、続けてテストを行うかどうかなどを判定しテストを続けることが可能とされる。 - 特許庁
The pixel signal of a reading period of n lines is compared with a reference signal for digitizing this pixel signal and count processing is performed at any one of down or up modes in parallel to the comparing processing, and a count value at the time of completion of the comparing processing is held.例文帳に追加
n行の読出期間の画素信号と、この画素信号をデジタル化する参照信号とを比較するとともに、この比較処理と並行してダウン/アップの何れかのモードでカウント処理を行ない、比較処理が完了した時点のカウント値を保持する。 - 特許庁
Further, if the write/read control unit 5 determines that the frequency of read requests from the higher-level device is smaller than a predetermined value after completion of the data write, a disk rotation control unit 9 stops the rotation of the disk of the RAID unit 11.例文帳に追加
さらに前記書き込み・読み出し制御部5が、前記データの書き込み終了後前記上位装置からの読み出し要求の頻度が所定値より少なくなったと判断すると、ディスク回転制御部9が、RAIDユニット11のディスクの回転を停止させる。 - 特許庁
| 例文 |
|
ログイン |
Weblio会員(無料)になると
|
|
ログイン |
Weblio会員(無料)になると
|